A substation has four groups of equipment. Primary equipment carries and switches power. Secondary equipment protects, measures and controls it. Auxiliary systems keep everything supplied with AC and DC power. Civil and safety items hold it all up and keep people and the environment safe. This guide lists every major item, explains what it does in plain English and shows where it sits in the substation.
Substation Equipment List: The Quick Answer
If you only need the names, here are the main items in a typical substation, grouped by type. The full table with functions, locations and standards follows in the next section. If you are new to the topic, start with what a substation is and then come back here.
- Primary equipment: power transformer, auto transformer, circuit breaker, isolator, earthing switch, current transformer (CT), voltage transformer (VT), capacitor voltage transformer (CVT), surge arrester, busbar, insulators, wave trap, reactors and capacitor banks.
- Secondary equipment: protection relays, control and relay panel (CRP), bay control unit (BCU), marshalling kiosk, RTU, SCADA, energy meters, fault recorders and digital substation equipment such as merging units.
- Auxiliary equipment: station auxiliary transformer, battery bank, battery charger, DC distribution board (DCDB), AC distribution board (ACDB), diesel generator (DG) set, lighting and ventilation.
- Civil and safety items: earth mat, lightning masts, fire protection, oil containment pits, cable trenches, steel structures, control building and fencing.
Not every substation has every item. The exact list depends on the voltage level, the single-line diagram, whether the yard is air-insulated or gas-insulated, and the utility’s specification. For example, a wave trap is only needed where power line carrier communication (PLCC) is used.
Substation Equipment at a Glance: Key Facts and Figures
The chart below shows how the 42 items in this guide’s master table split across the four groups. Primary equipment is the largest group because it covers every device in the power path.
These are the verified reference figures used in this guide. Where a figure is only an example from one project or one draft document, the table says so.
| Figure | What it tells you | Source |
|---|---|---|
| 765, 400, 220, 132, 66, 33 and 11 kV | Common nominal voltage classes in Indian transmission and distribution | CEA planning manual (2026) |
| 12.5 and 25 MVAr at 132 kV; 25 and 50 MVAr at 220 kV | Standard three-phase shunt reactor sizes | CEA Manual on Transmission Planning Criteria (2026) |
| Above 52 kV | Rated voltages covered by the GIS standard IEC 62271-203 | IEC |
| Above 1 kV AC | Installations covered by IEC 61936-1 (design and erection) | IEC 61936-1:2021 |
| Two battery sets, each with its own charger | Proposed DC arrangement for transmission substations of 132 kV and above | CEA draft connectivity standards (2026, draft status) |
| 31.5 kA, 1250 A or 2000 A | Example 132 kV circuit breaker rating in one CEA equipment schedule (project-specific, not a universal rating) | CEA equipment requirement document |
Complete Substation Equipment List With Functions
Use this table as a quick reference. Each item is explained in more detail in the sections after it. Standards are given as pointers; always check the current edition before using them on a project.
| Equipment | Category | Main function | Typical location | Standard |
|---|---|---|---|---|
| Power transformer | Primary | Changes voltage level | Transformer bay | IEC 60076 |
| Auto transformer | Primary | Links two close voltage levels using a shared winding | Transformer bay | IEC 60076 |
| Circuit breaker | Primary | Interrupts load and fault current | Every switching bay | IEC 62271-100 |
| Isolator (disconnector) | Primary | Gives safe isolation of a de-energised circuit | Both sides of breaker, bus side | IEC 62271-102 |
| Earthing switch | Primary | Earths a de-energised circuit for safe work | Line side, bus side | IEC 62271-102 |
| Current transformer (CT) | Primary | Scales current down for relays and meters | Bay, transformer bushings | IEC 61869 |
| Voltage transformer (VT/PT) | Primary | Scales voltage down for relays and meters | Bus or line bay | IEC 61869 |
| Capacitor voltage transformer (CVT) | Primary | Voltage signal at high voltage; can couple PLCC | Line bay | IEC 61869 |
| Surge arrester | Primary | Limits lightning and switching surges | Line entry, transformer terminals | IEC 60099-4 |
| Busbar | Primary | Collects and shares power between bays | Switchyard | IEC 61936-1 |
| Insulators | Primary | Support and insulate conductors | Throughout the yard | IEC 60168, 60273 |
| Wave trap (line trap) | Primary | Blocks carrier signals from entering the station | Line bay | IEC 60353 |
| Coupling capacitor | Primary | Couples PLCC signals to the line | Line bay | IEC 60358 |
| Shunt reactor | Primary | Absorbs reactive power, controls voltage | Reactor bay, line end | IEC 60076-6 |
| Series reactor | Primary | Limits fault current | In series with a circuit | IEC 60076-6 |
| Capacitor bank | Primary | Supplies reactive power, improves power factor | Capacitor bay | Utility specification |
| SVC / STATCOM | Primary | Fast, controllable reactive power support | Dedicated compensation area | Project specification |
| Protection relay | Secondary | Detects faults and sends trip commands | Control room, CRP | IEC 60255 |
| Control and relay panel (CRP) | Secondary | Houses relays, control and indication | Control room | Utility specification |
| Bay control unit (BCU) | Secondary | Controls and monitors one bay | Control room or bay panel | IEC 61850 |
| Marshalling kiosk | Secondary | Collects field cables and signals | Near equipment in the yard | Utility specification |
| RTU | Secondary | Collects data and sends it to control centre | Control room | IEEE C37.1 |
| SCADA | Secondary | Remote monitoring and control | Control room, control centre | IEEE C37.1, IEC 61850 |
| Energy meter (ABT, tariff) | Secondary | Measures energy for billing and accounting | Metering panel | Utility specification |
| Disturbance / fault / SOE recorder | Secondary | Records what happened during a fault | Control room | Utility specification |
| Merging unit | Secondary | Turns CT/VT signals into digital data | Near the bay | IEC 61850 |
| GPS clock | Secondary | Keeps all devices time-synchronised | Control room | IEC 61850 |
| Station auxiliary transformer | Auxiliary | Supplies the substation’s own AC loads | Near control building | IEC 60076 |
| Battery bank | Auxiliary | Supplies DC to protection and trip coils | Battery room | IEC 60896, IEEE 450 |
| Battery charger | Auxiliary | Charges batteries and feeds DC loads | Battery or control room | Utility specification |
| DCDB | Auxiliary | Distributes DC supply | Control building | Utility specification |
| ACDB | Auxiliary | Distributes AC auxiliary supply | Control building | Utility specification |
| Diesel generator (DG) set | Auxiliary | Standby AC supply | Auxiliary area | Utility specification |
| Lighting and ventilation | Auxiliary | Safe working light, cooling of indoor rooms | Yard and buildings | Local code |
| Earth mat | Civil and safety | Controls step and touch voltage | Buried under the yard | IEEE 80, IS 3043 |
| Lightning mast / shield wire | Civil and safety | Intercepts direct lightning strikes | Yard, line entry | IEC 61936-1 |
| Fire detection and fighting | Civil and safety | Detects and controls fire | Control building, transformer area | IEEE 979, local fire code |
| Oil containment pit / soak pit | Civil and safety | Contains spilt transformer oil | Under or near oil-filled equipment | Utility and environmental rules |
| Cable trenches | Civil and safety | Routes power and control cables | Across the yard | Utility specification |
| Steel structures and gantries | Civil and safety | Support equipment and conductors | Switchyard | Utility specification |
| Control building | Civil and safety | Houses panels, batteries and communication | Edge of switchyard | Utility specification |
| Fencing and gates | Civil and safety | Keeps unauthorised people out | Site boundary | IEC 61936-1 |
Primary Equipment of a Substation (Power Circuit)
Primary equipment is connected directly to the high-voltage circuit. If one of these items fails, power flow, fault clearing or voltage control is affected.
Power Transformer and Auto Transformer
A power transformer steps voltage up or down between two voltage levels, for example 400 kV to 220 kV. Its key ratings are MVA capacity, voltage ratio, impedance, cooling class, tap range and vector group. You can read more about the different types of transformers, the transformer cooling methods and the transformer vector group in our separate guides.
An auto transformer uses one shared winding instead of two separate ones. It is common where the two voltages are fairly close, such as 400/220 kV. Substation transformers are built for transmission duty, so they differ from the small units on poles; see power transformer vs distribution transformer for the difference. Transformer protection devices such as the Buchholz relay and routine transformer oil testing help catch internal faults early.
Circuit Breaker
A circuit breaker can make, carry and break current in normal and fault conditions. A protection relay tells it when to open. At transmission voltages, SF6 breakers are common. At medium voltage (11 kV and 33 kV), vacuum breakers are widely used. The choice depends on voltage, fault duty and the owner’s maintenance policy. Key ratings are rated voltage, rated current, short-circuit breaking current and operating sequence. See our guide to the types of circuit breakers for the full range.
Isolator (Disconnector) and Earthing Switch
An isolator, called a disconnector in IEC and UK usage and a disconnect switch in the US, gives a visible gap in the circuit so people can work safely. It is not meant to break load current. An earthing switch then connects the dead circuit to earth and discharges any trapped charge.
The usual order of work is: the relay or operator opens the circuit breaker, the isolators are opened once the circuit is confirmed dead, and then the earthing switch is closed. Exact steps depend on the scheme, the interlocks and the utility’s own procedure.
CT, VT and CVT (Instrument Transformers)
Relays and meters cannot be connected to thousands of amps or hundreds of kilovolts, so instrument transformers scale the values down. A CT is connected in series with the primary circuit and gives a small, proportional current (commonly 1 A or 5 A). A VT is connected in parallel across the voltage and gives a small, proportional voltage (commonly 110 V). A CVT uses a capacitor divider and is used at higher voltages, where it is cheaper than a conventional VT. It can also carry PLCC signals. Important ratings are ratio, accuracy class and burden.
Surge Arrester (Lightning Arrester)
A surge arrester is connected between phase and earth. It limits overvoltages from lightning or switching by passing the surge safely to earth. It is placed at line entries and close to transformer terminals. The terms are often mixed up, so see lightning arrester vs surge arrester and our overview of surge protection device types.
Busbar and Insulators
A busbar is the common connection point that collects power from incoming bays and shares it with outgoing bays. Common layouts include single busbar, double busbar and breaker-and-a-half. Post insulators support rigid busbars, while strain and suspension insulators hold overhead conductors under tension. Bushings carry a conductor through a grounded tank or wall. For layouts and materials, read what a busbar is.
Wave Trap and Coupling Capacitor
A wave trap (called a line trap elsewhere) lets power-frequency current pass but blocks high-frequency carrier signals, so they stay on the line and do not leak into the substation. A coupling capacitor, or a CVT acting as one, connects the PLCC equipment to the line. Many networks now use fibre-optic cable (OPGW) instead, so wave traps are no longer in every substation.
Reactors, Capacitor Banks and Dynamic Compensation
These devices manage reactive power and voltage:
- Shunt reactor: absorbs reactive power on lightly loaded or long lines, which stops voltage rising too high.
- Series reactor: limits fault current.
- Neutral grounding reactor or resistor: limits earth-fault current.
- Capacitor bank: supplies reactive power and improves power factor and voltage.
- SVC, STATCOM and synchronous condenser: give fast, adjustable voltage support where the grid is weak or has a lot of renewable power.
CEA’s 2026 planning manual gives standard shunt reactor sizes for different voltage classes. The chart shows the two standard sizes for 132 kV and 220 kV.
Secondary Equipment of a Substation (Protection, Control and Automation)
Secondary equipment does not carry the main power. It watches the primary equipment and acts on it. If it fails, power may still flow, but faults may not be cleared and operators lose visibility.
- Protection relays: sense faults such as overcurrent, earth fault, differential, distance, over/undervoltage and busbar faults, then send a trip signal to the breaker. Read about the types of protection relays, how protection coordination works and how relays are checked in relay testing. Relay functions are often labelled with the ANSI device numbers.
- Control and relay panel (CRP): a panel holding relays, control switches, indications and meters for a bay.
- Bay control unit (BCU): an electronic unit that controls and monitors one bay and passes data to the station system.
- Marshalling kiosk: a cabinet near the equipment where field cables end and signals are routed to the control room. Some utilities call it a control cabinet.
- RTU and SCADA: the RTU collects data and commands at the substation. SCADA is the wider system that lets operators see and control many substations remotely.
- Energy meters: tariff and ABT (availability-based tariff) meters, with test blocks, fed from metering-class CTs and VTs.
- Recorders: disturbance recorders, fault recorders and sequence-of-events (SOE) recorders store data for fault analysis.
- Digital substation equipment: under IEC 61850, merging units convert CT and VT signals into digital data on a process bus, and GPS clocks keep devices in step. This replaces much of the copper wiring.
Auxiliary Equipment of a Substation (Support Systems)
Auxiliary systems give the substation its own reliable power. The most important one is the DC system. When the AC grid collapses, the battery must still trip breakers and power the relays.
- Station auxiliary transformer: feeds lighting, chargers, cooling fans, air conditioning and other station loads.
- Battery bank and charger: provide DC for trip coils, relays, communication and emergency lighting. CEA’s 2026 draft connectivity standards state that transmission substations of 132 kV and above should have two battery sets, each with its own charger. This is a draft, so check the final version.
- DCDB and ACDB: distribution boards that split DC and AC supply into protected feeders.
- DG set: a standby generator for essential AC loads during outages.
- Lighting and ventilation: normal and emergency lighting, plus ventilation or air conditioning for control and battery rooms.
Civil, Structural and Safety Equipment
- Earth mat: a buried grid of conductors and rods that carries fault current into the ground and keeps step and touch voltages safe. Compare the terms in earthing vs grounding and see the types of earthing systems.
- Lightning masts and shield wires: intercept direct strikes. They are not the same as surge arresters, which limit voltage on the equipment.
- Fire detection and fighting: detectors, extinguishers and suppression systems, with extra protection for oil-filled transformers.
- Oil containment: oil pits, soak pits and drains with oil-water separation to stop spilt oil spreading.
- Cable trenches and ducts: route control and power cables, with power and control cables kept apart.
- Structures and buildings: equipment foundations, steel gantries, the control building, roads, drainage, boundary wall and fencing.
- Environmental monitoring: SF6 gas density monitoring and gas handling equipment where SF6 is used.
Substation Equipment List by Voltage Level (765 kV to 11 kV)
People often search for a 132 kV, 220 kV or 400 kV substation equipment list. The table below gives the groups of equipment you can usually expect. These are indicative, not fixed. The real list comes from the project’s single-line diagram and technical specification.
| Voltage level | Common equipment | Notes |
|---|---|---|
| 765 kV | EHV transformers or auto transformers, circuit breakers, isolators, CTs, CVTs, surge arresters, shunt reactors, advanced protection and communication | Reactors are often needed for long lines; SVC/STATCOM where dynamic support is needed |
| 400 kV | EHV breakers, isolators, busbars, CTs, CVTs, surge arresters, shunt reactors, protection and SCADA | Wave traps only where PLCC is used |
| 220 kV | Transformers, breakers, isolators, CTs, CVTs, surge arresters, reactors or capacitor banks, DC system | GIS is possible where land is limited |
| 132 kV | Transformers, breakers, isolators with earth switches, CTs, CVTs, surge arresters, bus-post insulators, station transformer, protection and DC system | A CEA 132 kV schedule lists these items |
| 66 kV | Transformers, switchgear, instrument transformers, surge arresters, protection and metering | Mix of AIS and indoor switchgear |
| 33 kV | Distribution transformers, switchgear, capacitor banks, protection and metering | Wave traps are rare |
| 11 kV | Vacuum circuit breakers, distribution transformers, protection and metering | RMUs and reclosers appear at distribution level only |
Wave traps, shunt reactors, GIS and SVC/STATCOM depend on the network’s needs, line length and available land, not on voltage alone. The switching devices at 66 kV and below are often grouped into panels; see what switchgear is and the types of switchgear panels.
AIS vs GIS: How the Equipment Changes
In an air-insulated substation (AIS), separate devices stand in an open yard with air gaps between them. In a gas-insulated substation (GIS), the breaker, isolators, earthing switches, busbars and often the instrument transformers sit inside sealed metal modules filled with insulating gas, usually SF6 or an SF6-free alternative. IEC 62271-203 covers GIS for rated voltages above 52 kV. GIS still has isolators and earthing switches; they are simply inside the enclosure.
| Function | AIS equipment | GIS equivalent |
|---|---|---|
| Insulation | Air at atmospheric pressure | Insulating gas or gas mixture in sealed enclosures |
| Fault interruption | Open-type circuit breaker | Breaker module |
| Isolation and earthing | Outdoor isolators and earthing switches | Enclosed disconnector and earthing switch modules |
| Busbar | Open conductors on insulators | Enclosed busbar |
| CT and VT | Free-standing units | Built into or next to the bay modules |
| Line connection | Overhead conductors and gantries | SF6-to-air bushing or cable sealing end |
| Space needed | Large | Compact |
| Exposure to weather and pollution | Exposed | Protected |
| Maintenance | Easy to see and reach; needs cleaning and checking | Needs gas handling tools and trained staff |
SF6-free switchgear is a developing area. Before specifying it, check current manufacturer data and local regulation.
Substation Equipment List by Bay Type
A bay is one switching section that serves a single line, transformer, bus coupler or compensation device. The diagram below shows the usual order of equipment in an outgoing line bay, starting from the busbar.
| Bay type | Typical equipment |
|---|---|
| Incoming line bay | Surge arrester, CVT, wave trap (if PLCC), CT, circuit breaker, line and bus isolators, earthing switches |
| Outgoing feeder bay | CT, circuit breaker, isolators, earthing switches, CVT or VT where required, surge arrester where specified |
| Transformer bay | Transformer with bushings, tap changer and cooling equipment, Buchholz relay, CTs, breaker, isolators, surge arresters, neutral equipment |
| Bus coupler / bus section bay | Breaker or isolator, CTs, earthing switches, protection and synchronising facilities |
| Capacitor bank bay | Capacitor bank, switchgear, protection, discharge and earthing arrangements |
| Reactor bay | Shunt reactor, switchgear, protection, surge arresters, neutral equipment |
Important Standards for Substation Equipment
Standards set the ratings, tests and safety rules, so equipment from different makers works together. In India, CEA technical standards and Bureau of Indian Standards (IS) documents apply, and many follow IEC. IEEE standards are widely used in North America. Always check the current edition before use.
| Standard | Covers |
|---|---|
| IEC 60076 series | Power transformers |
| IEC 62271-100 | AC circuit breakers |
| IEC 62271-102 | Disconnectors and earthing switches |
| IEC 62271-203 | Gas-insulated metal-enclosed switchgear above 52 kV |
| IEC 61869 series | Instrument transformers |
| IEC 60099-4 and -5 | Surge arresters |
| IEC 60255 | Measuring relays and protection equipment |
| IEC 61850 | Substation communication and automation |
| IEC 61936-1:2021 | Design and erection of AC installations above 1 kV |
| IEEE 80 | Substation grounding safety |
| IEEE C37.1 | Substation SCADA and automation systems |
| IS 3043 | Earthing code of practice (India) |
Substation Equipment Inspection and Maintenance Checklist
Inspection frequency differs between utilities, equipment types and operating conditions, so this guide does not give one fixed schedule. Use the interval in your utility’s maintenance manual or the manufacturer’s instructions. The table shows what to look at for each equipment group.
| Equipment | What to check |
|---|---|
| Power transformer | Oil level and leaks, temperature, silica gel colour, cooling fans and pumps, bushings, Buchholz relay |
| Circuit breaker | SF6 gas pressure or density, operating mechanism, counter reading, heaters in the control cabinet |
| Isolator and earthing switch | Contact condition, smooth mechanical operation, interlocks, earth connections |
| CT, VT and CVT | Oil leaks, cracked porcelain, secondary terminals, signs of overheating (thermography) |
| Surge arrester | Cleanliness, cracks, earth connection, leakage current reading where fitted |
| Battery and charger | Cell voltages, electrolyte level, charger output, battery capacity test |
| Earthing system | Tight, corrosion-free joints and earth resistance values |
| Protection relays | Settings, trip tests, alarms; see relay testing |
| Cables and panels | Insulation, terminations, cleanliness; see insulation resistance (megger) test |
| Fire protection | Extinguisher dates, detector function, pump and valve checks |
A simple inspection record should hold the equipment ID, bay name, date, inspector name, condition (OK or action needed), readings, remarks and signature. Common warning signs include oil leaks, unusual noise or humming, hot spots, falling gas pressure, cracked insulators, corrosion and a battery that cannot hold charge.
Substation Equipment BOQ: What to Include
A bill of quantities (BOQ) turns the equipment list into a purchase and construction schedule. It is built from the project drawings, bay by bay. A general equipment list is not a BOQ because it has no quantities, ratings or accessories. A BOQ is usually split into electrical equipment, control and protection, auxiliary systems and civil works. Each line should carry these fields:
| Item no. | Description | Voltage and current rating | Quantity and unit | Bay | Standard | Remarks |
|---|---|---|---|---|---|---|
| 1 | Example: circuit breaker | As per specification | As per drawing | Line bay 1 | IEC 62271-100 | Manufacturer requirements |
Quantities and specifications always come from the approved drawings and technical documents. Do not copy them from another project.
Commonly Confused Substation Equipment
| Pair | The difference |
|---|---|
| Circuit breaker vs isolator | The breaker interrupts load and fault current. The isolator only isolates a dead circuit. |
| Isolator vs earthing switch | The isolator opens a gap. The earthing switch connects the dead circuit to earth. |
| CT vs VT | A CT is in series and measures current. A VT is in parallel and measures voltage. |
| VT vs CVT | A CVT uses a capacitor divider, suits high voltage and can couple PLCC signals. |
| Surge arrester vs lightning mast | The arrester limits surge voltage. The mast intercepts direct lightning. |
| Wave trap vs coupling capacitor | The wave trap blocks carrier signals. The coupling capacitor injects them onto the line. |
| Power transformer vs station auxiliary transformer | One transfers bulk power between voltages. The other supplies only the substation’s own loads. |
| ACDB vs DCDB | ACDB distributes AC supply. DCDB distributes battery-backed DC supply. |
| RTU vs SCADA | The RTU collects and sends data at site. SCADA is the full monitoring and control system. |
Equipment Names in India, the UK and the US
| Item | India | UK | US |
|---|---|---|---|
| Disconnecting device | Isolator | Disconnector | Disconnect switch |
| Carrier blocking device | Wave trap | Line trap | Line trap / wave trap |
| Overvoltage protection | Lightning arrester | Surge arrester | Surge arrester / lightning arrester |
| Capacitive voltage device | CVT | CVT | CCVT or CVT |
| Field signal cabinet | Marshalling kiosk | Marshalling kiosk | Control cabinet |
Safety Precautions
- Only authorised, competent people may enter a substation or work on its equipment.
- Follow approved isolation and earthing procedures and permit-to-work rules.
- Wear the correct personal protective equipment (PPE).
- Keep to the required electrical safety clearances.
- Follow manufacturer instructions, utility rules and local regulations.
Frequently Asked Questions About Substation Equipment
What are the main equipment in a substation?
The main items are power transformers, circuit breakers, isolators, instrument transformers (CT, VT, CVT), surge arresters, busbars, protection relays, control panels, batteries with chargers, and the earthing system.
What are the primary and secondary equipment of a substation?
Primary equipment is in the power path, such as transformers, breakers and isolators. Secondary equipment protects, measures and controls the primary equipment, such as relays, meters and SCADA.
What is the most important equipment in a substation?
There is no single answer. The power transformer is usually the most costly and critical item, but a substation cannot work safely without breakers, protection and a dependable DC supply.
What is the difference between an isolator and a circuit breaker?
A circuit breaker can interrupt load and fault current. An isolator cannot. It is opened only after the breaker has opened, to create a safe visible gap.
Why is a battery bank used in a substation?
It supplies DC power to relays, trip coils and communication equipment, so protection still works if the AC supply is lost.
What is the function of a wave trap?
It blocks high-frequency PLCC signals from entering the substation while letting power-frequency current pass.
What does a CVT do in a substation?
It reduces high line voltage to a small, accurate value for protection and metering, and it can also couple carrier signals to the line.
What equipment is used in a 132 kV or 220 kV substation?
Typically transformers, circuit breakers, isolators with earthing switches, CTs, CVTs, surge arresters, busbars with insulators, protection and control panels, and a DC system. The exact list depends on the project.
What is the difference between AIS and GIS?
AIS uses open-air equipment and needs more land. GIS packs the same functions into sealed, gas-filled modules and needs much less space.
What is a substation bay?
A bay is a set of equipment that serves one line, transformer, bus coupler or compensation device.
What is the function of an earth mat?
It gives fault current a low-resistance path to ground and keeps step and touch voltages within safe limits.
What is a marshalling kiosk used for?
It is a cabinet in the yard where cables from field equipment end. From there, signals are routed to the control and protection panels.
Conclusion
A substation is more than a transformer and a few breakers. Primary equipment moves and switches the power, secondary equipment protects and controls it, auxiliary systems keep it running, and civil and safety items protect people and the environment. Use the master table to find any item quickly, and always check the project drawings, the utility specification and the current standards before selecting or ordering equipment.
Disclaimer: this article is for learning only. Design, selection, installation, operation, testing and maintenance of substation equipment must be done by qualified, authorised people following local regulations, utility requirements and manufacturer instructions. Substations are hazardous and must not be entered without authorisation.