BS 7671 is the UK’s national standard for electrical installations. Almost everyone calls it the IET Wiring Regulations, or simply “the Regs”. It sets out how to design, install, inspect and test low-voltage electrical installations so that they are safe. The Institution of Engineering and Technology (IET) and the British Standards Institution (BSI) publish it together.
The current version is BS 7671:2018+A4:2026. It is still the 18th Edition, updated by Amendment 4 on 15 April 2026. BS 7671 is not an Act of Parliament, but it is the benchmark that electricians, inspectors, building control and landlords’ safety checks rely on. This guide explains what it covers, what changed in 2026, how it relates to UK law and where to get a genuine copy.
| Detail | Current information |
|---|---|
| Edition | 18th Edition |
| Current amendment | Amendment 4:2026 |
| Full designation | BS 7671:2018+A4:2026 |
| Publication date | 15 April 2026 |
| Previous version withdrawn | 15 October 2026 |
| Last verified | 8 November 2026 |
1500 V DCUpper voltage scope (HSE)
What Is BS 7671?
BS 7671, Requirements for Electrical Installations, is the UK’s national standard for the design, erection and verification of electrical installations. In plain terms, it is the rulebook for how wiring, protective devices and electrical equipment should be put together so people and property stay safe.
What does BS 7671 stand for?
“BS” stands for British Standard. 7671 is simply the standard’s reference number. BSI adopted the wiring rules as BS 7671 in 1992, and the 18th Edition has been in use since 2018.
Why is BS 7671 also called the IET Wiring Regulations?
The rules began life as the Institution of Electrical Engineers’ Wiring Regulations. That institution is now the IET, so the name stuck even after BSI took over publication of the standard. The 2026 consolidated book is known in the trade as the “Orange Book”.
Who publishes BS 7671?
The IET and BSI publish it jointly, and BSI issues it as a British Standard.
What is the purpose of BS 7671?
Its purpose is electrical installation safety. It sets minimum requirements for protection against shock, fire and overheating, and for selecting equipment, so an installation is safe and works as intended.
Who needs to understand the BS 7671 regulations?
- Electricians, designers and installers who must work to it every day.
- Apprentices and students sitting 18th Edition qualifications.
- Landlords and property managers who commission inspections and need to read the results.
- Homeowners who want to understand a certificate or quote.
What Is the Latest Edition of BS 7671?
The latest edition is the 18th Edition, as amended by Amendment 4:2026. No 19th Edition has been published.
Is the 18th Edition still current?
Yes. Amendment 4 updated the 18th Edition rather than replacing it. Since 15 October 2026, BS 7671:2018+A4:2026 has been the only valid version. The IET and BSI withdrew the previous version, BS 7671:2018+A2:2022+A3:2024, six months after publication.
What is BS 7671:2018+A4:2026?
Read the designation in three parts: 7671 is the standard, :2018 is the year of the 18th Edition, and +A4:2026 means Amendment 4, issued in 2026. The new book consolidates earlier changes, including Amendment 3:2024, into the main text, so you no longer need a separate “bolt-on” document.
History of the 18th Edition amendments
| Edition / amendment | Publication | Status in November 2026 |
|---|---|---|
| BS 7671:2018 | July 2018 | Superseded as a consolidated version |
| Amendment 1:2020 | February 2020 | Historical |
| Amendment 2:2022 | March 2022 | Superseded |
| Amendment 3:2024 | July 2024 | Previous version withdrawn |
| Amendment 4:2026 | April 2026 | Current |
What changed in Amendment 4:2026?
The IET describes the changes as substantial. The main ones are:
- Stationary secondary batteries. A new chapter covers home and commercial battery storage, including system design, hybrid inverters, protective devices suited to two-way energy flow, battery location, ventilation and fire-risk reduction.
- Functional earthing and equipotential bonding for ICT equipment. A new section covers data and communications systems.
- Power over Ethernet (PoE). A new Section 716 covers low-voltage power carried over data cabling.
- Medical locations. Section 710 has been extensively revised.
- Testing documentation. Inspection and certification documents were updated, including how “further investigation” (FI) observations are classified.
There are also smaller changes across every Part, and more European and international standards have been adopted. Trade bodies also point to changes for protective devices on electric vehicle charging installations.
Is the 19th Edition available?
No. Amendment 4 is a fully consolidated reprint of the 18th Edition. Anyone who says “the 19th Edition is out” is mistaken.
When does a new amendment become applicable?
Amendment 4 could be used immediately from 15 April 2026. During the six-month overlap, installers could work to either version. For new work started on or after 15 October 2026, certificates must be issued to Amendment 4, and periodic inspections must also be carried out to it.
Do existing electrical installations need upgrading after an amendment?
Not automatically. BS 7671 is not retrospective, so an installation that met the rules when it was installed is not unsafe just because a newer amendment exists. New work, additions and alterations should follow the current version, and an inspection judges whether an older installation is still safe to use. We cover this again under legal requirements below.
What Is BS 7671 Used For?
BS 7671 applies to the design, selection, erection and verification of electrical installations in homes, shops, offices, industrial sites and many other premises. It covers installations with a nominal voltage up to 1000 V AC or 1500 V DC. High-voltage generation, transmission and distribution networks sit outside its scope.
- Design: working out circuits, protective devices, earthing and cable sizes.
- Selection of equipment: choosing cables, switchgear and accessories suited to the environment.
- Additions and alterations: extending or changing an existing installation without making it less safe.
- Inspection and verification: testing a new or existing installation. Tests include continuity, earth fault loop impedance, RCD operation and insulation resistance testing with a megger.
- Domestic, commercial and industrial use: the same principles apply, with extra rules for special locations.
Some equipment and installation types also need to meet other standards, such as those for fire detection systems or machinery. BS 7671 does not replace them.
How Is BS 7671 Organised?
Understanding the eight Parts of BS 7671
| Part | Main subject |
|---|---|
| Part 1 | Scope, object and fundamental principles |
| Part 2 | Definitions |
| Part 3 | Assessment of general characteristics |
| Part 4 | Protection for safety |
| Part 5 | Selection and erection of equipment |
| Part 6 | Inspection and testing |
| Part 7 | Special installations or locations |
| Part 8 | Prosumer’s low-voltage electrical installations |
Part 8 matters where a building generates, stores and uses its own electricity, for example with solar PV and batteries. The full contents list is copyrighted, so use the authorised publication for exact wording.
What are Chapters, Sections and Regulations?
Each Part is split into Chapters, then Sections, then individual Regulations. A regulation is a single numbered requirement.
How to understand BS 7671 regulation numbers
Numbers follow the structure, so they tell you where you are. Regulation 411.3.2, for example, sits in Part 4 (the first digit), Chapter 41, Section 411, and then continues into sub-numbers. The special-location sections all begin with 7, such as 701 for bathrooms or 722 for electric vehicle charging.
What are the appendices in BS 7671?
The appendices hold supporting information, including model forms for certificates and reports, tables for cable selection and guidance on calculations. Designers and inspectors use them constantly.
How to navigate the Wiring Regulations
Start with Part 2 if a term is unfamiliar. Go to Part 4 for protection, Part 5 for equipment and Part 6 for testing. Check Part 7 if the location is unusual, then use the appendices for tables and forms. The IET’s On-Site Guide is a quicker route for routine domestic work.
What Are the Main Safety Principles in BS 7671?
The rules look complex, but they rest on a handful of ideas. This section explains each one in plain English without calculations or numerical limits. Always take figures from the authorised standard.
Protection against electric shock
Shock happens when current passes through a person. BS 7671 puts shock protection at the centre of design, using two layers: basic protection and fault protection.
Basic protection and fault protection
Basic protection stops you touching live parts during normal use. Insulation, barriers and enclosures do this. Fault protection works when something fails and exposed metalwork becomes live. Earthing, bonding, automatic disconnection and RCDs all belong here.
Automatic disconnection of supply (ADS)
ADS is the most common fault-protection method. If a fault occurs, the protective device must cut the supply quickly enough to prevent a harmful shock. It only works if the earthing arrangement and circuit are right, which is why testing under Part 6 matters.
Earthing and protective bonding
Earthing gives fault current a low-resistance path back to the source, so the protective device operates. Protective bonding connects metal parts such as pipework so they stay at a similar potential. UK supplies use one of several types of earthing systems, and the type affects how protection is designed. If you meet the word “grounding” abroad, our guide to earthing and grounding terminology explains the difference.
What are RCDs and RCBOs?
A residual current device (RCD) compares the current in the live and neutral conductors. If some current leaks away, perhaps through a person, it disconnects very quickly. An RCBO combines an RCD with an overcurrent breaker in one unit, so a fault trips only that circuit. See our overview of types of circuit breakers for how these devices compare.
Overcurrent protection
Overcurrent means too much current, either from an overload or a short circuit. It can overheat cables and start fires. Protective devices break the circuit before damage occurs. A fuse or circuit breaker does the job, and in larger systems the devices must also work together so only the one nearest the fault trips. That principle is called protection coordination.
Protection against overheating and electrical fires
Heat builds up from overloaded cables, loose connections or damaged insulation. BS 7671 requires equipment to be selected and installed so it does not create a fire risk. Correct cable sizing, protective devices and, in some cases, AFDDs all contribute.
Surge protection devices (SPDs)
Surges are short voltage spikes from lightning or switching. They can damage equipment or shorten its life. BS 7671 asks designers to assess the risk of transient overvoltage and decide whether an SPD is needed. Our guide to surge protection device types explains the options.
Arc Fault Detection Devices (AFDDs)
An AFDD detects dangerous arcing in final-circuit wiring, such as a damaged cable or loose terminal, and disconnects the circuit to reduce fire risk. BS 7671 asks designers to consider them. An AFDD is not the same as arc-flash protection. Arc flash is an explosive release of energy that endangers people working on live equipment, and we cover it in our guide to arc flash hazards.
Isolation and switching
Installations need ways to switch equipment off safely for maintenance and in emergencies. Isolation gives a secure break in the supply so work can be done safely. In larger installations the same job is handled by switchgear.
Cable selection and current-carrying capacity
A cable must carry its load without overheating. How much current it can carry depends on its size and type, how it is installed, nearby cables and the surrounding temperature. Designers use the tables in the appendices of BS 7671 to choose it.
Understanding voltage drop
Voltage falls along a cable as current flows. If it falls too far, lights dim and motors struggle. BS 7671 sets limits and the appendices explain how to check them, so installers and designers calculate it rather than guess.
What Are Part 7 Special Installations and Locations?
Some environments carry extra electrical risk, from water to temporary supplies. Part 7 adds rules on top of the general requirements for them. This table is an overview, not the full list, so check the authorised A4:2026 publication for every section.
| Section | Location or installation | Why it needs extra rules |
|---|---|---|
| 701 | Bathrooms and shower rooms | Wet skin lowers resistance to shock, and the zones around baths and showers limit what can be installed. |
| 702 | Swimming pools and other basins | Water and bare feet raise shock risk. |
| 703 | Saunas | Heat and humidity stress equipment. |
| 704 | Construction and demolition sites | Temporary supplies, rough handling and mobile equipment. |
| 705 | Agricultural and horticultural premises | Livestock are sensitive to shock, and damp, dust and corrosion are common. |
| 706 | Locations with restricted movement | Working inside metal tanks or similar spaces makes shock more dangerous. |
| 708 | Caravan and camping parks | Outdoor, temporary connections used by the public. |
| 709 | Marinas | Water, corrosion and boats connected to shore supplies. |
| 710 | Medical locations | Vulnerable patients and the need for reliable supplies. Heavily revised in Amendment 4. |
| 711 | Exhibitions, shows and stands | Temporary, public-facing installations assembled repeatedly. |
| 712 | Solar photovoltaic systems | Panels produce DC electricity whenever light falls on them. |
| 716 | Power over Ethernet | New in Amendment 4. Power is carried over data cabling. |
| 722 | Electric vehicle charging installations | High loads for long periods, often outdoors. |
What Does Section 712 Say About Solar PV Systems?
Section 712 sets the extra requirements for solar photovoltaic (PV) power supply systems. They are needed because a PV array keeps producing DC electricity whenever there is light, and it cannot simply be switched off at the panel.
- AC and DC sides: panels generate DC, an inverter converts it to AC, and each side needs suitable protection and cable choices.
- Isolation and protection: installers must be able to isolate both sides safely for maintenance or an emergency.
- Labelling: clear warnings tell firefighters and other workers that the installation has more than one source of supply.
- Batteries and prosumer systems: Amendment 4’s new battery chapter and Part 8 apply when storage is added, because power can flow in both directions.
For practical guidance beyond the standard, the IET publishes a Code of Practice for solar PV installations. Only competent installers should carry out this work.
Is BS 7671 a Legal Requirement?
No, BS 7671 is not a law. It is a non-statutory British Standard. The HSE’s guidance on the Electricity at Work Regulations 1989 says that following BS 7671 is likely to achieve compliance with the relevant parts of those regulations. So the law sets the duty, and BS 7671 shows a recognised way to meet it.
Is BS 7671 a law in the UK?
No. It was written by the IET and published by BSI, not passed by Parliament. In practice, though, ignoring it is risky. If an installation causes harm, a court or the HSE will ask whether recognised good practice was followed, and BS 7671 is that benchmark.
What is the Electricity at Work Regulations 1989?
These are the statutory workplace regulations covering electrical safety across Great Britain. They place duties on employers, the self-employed and employees, and they require people working with electricity to be competent. The HSE publishes guidance on them as HSR25.
How does BS 7671 relate to Part P?
Part P is a requirement of the Building Regulations 2010 in England and Wales. It covers electrical safety in dwellings. BS 7671 gives the technical detail, while Part P decides when work must be notified or certified. Scotland and Northern Ireland have their own building rules, so Part P does not apply there.
What is the role of Approved Document P?
Approved Document P is government guidance for England on meeting Part P. It explains which work is notifiable, such as installing a new circuit, and the routes for certifying it: a registered competent person, a registered third-party certifier or building control.
| Document or arrangement | Purpose |
|---|---|
| BS 7671 | Technical electrical installation standard |
| Electricity at Work Regulations 1989 | Workplace electrical safety legislation |
| Part P | Electrical safety requirements within the Building Regulations in England and Wales |
| Approved Document P | Government guidance supporting Part P in England |
| Competent-person schemes | Arrangements for registering competent installers who can self-certify notifiable work |
What happens if an electrical installation does not comply?
The outcome depends on the setting. At work, the HSE can take enforcement action under the Electricity at Work Regulations. For notifiable domestic work, building control can require changes. In rented homes, a local authority can serve a remedial notice and, in England, issue a civil penalty of up to £30,000 for breaching the landlord regulations.
Does an older installation automatically become non-compliant?
No. A new amendment does not make an older installation unlawful or automatically unsafe. An inspection decides whether it is still satisfactory, and any new work added to it should meet the current standard.
What Are the Electrical Safety Requirements Across the UK?
Building standards and housing law are devolved, so the rules differ across the four nations. In the private rented sector all four now require periodic inspection, generally at five-year intervals. The details, start dates and tenancies covered are not the same.
| Nation | Building rules for electrical work | Landlord electrical checks (private rented sector) |
|---|---|---|
| England | Part P of the Building Regulations 2010, with Approved Document P | Inspection at least every five years under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. Extended to social housing from 2025. |
| Wales | Part P applies through the Building Regulations 2010 | Five-yearly inspection through fitness-for-habitation rules under the Renting Homes (Wales) Act 2016, from December 2022. |
| Scotland | Building (Scotland) Regulations 2004. Part P does not apply. | Five-yearly inspection under the repairing standard (Housing (Scotland) Act 2006) since 2015, plus testing of landlord-supplied portable appliances. |
| Northern Ireland | Building Regulations (Northern Ireland) 2012. Part P does not apply. | Five-yearly inspection under the Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024, in force from 1 April 2025 for new tenancies. |
Electrical safety regulations in England
England relies on Part P for building work and the 2020 regulations for landlords. GOV.UK guidance says landlords must make sure electrical safety standards are met and that the standards are those in BS 7671.
Pending change in England: The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) (Amendment) Regulations 2026 are due to come into force on 30 November 2026. They update the definition of the electrical safety standards so it refers to BS 7671:2018+A4:2026. As of 8 November 2026 this date is still pending, so check legislation.gov.uk before relying on it.
Electrical safety regulations in Wales
Wales shares Part P with England but sets landlord duties through its own housing law, the Renting Homes (Wales) Act 2016.
Electrical safety regulations in Scotland
Scotland uses its own building standards and the repairing standard for rented homes. Part P does not apply.
Electrical safety regulations in Northern Ireland
Northern Ireland has its own building regulations. Mandatory five-yearly checks for private tenancies are recent, so landlords there should confirm which of their tenancies are already covered.
What are the electrical inspection requirements for landlords?
For a private let, the usual duty is an electrical installation condition report (EICR) from a qualified person at least every five years, with a copy given to tenants. Which property types are covered, when the first report was due and how it is shared vary by nation, and social housing follows separate rules. Always check the government guidance for your nation.
Why do electrical safety rules differ across the UK?
Each nation sets its own building regulations and housing law. BS 7671 itself is a UK-wide standard, so the technical rules for good wiring are the same everywhere.
What Is the Difference Between EIC, EICR and Minor Works Certificates?
The three documents record different stages of an installation’s life.
| Document | When it is used | What it confirms |
|---|---|---|
| Electrical Installation Certificate (EIC) | New installation, or a major alteration such as a new circuit or consumer unit | The design, construction, inspection and testing meet BS 7671 (initial verification) |
| Electrical Installation Condition Report (EICR) | Periodic check of an existing installation, for example for landlords or a sale | The current condition of the installation, with observations and a satisfactory or unsatisfactory outcome |
| Minor Electrical Installation Works Certificate | Small additions or alterations that do not include a new circuit | The minor work was inspected, tested and meets BS 7671 |
Why are electrical certificates important?
They are your proof that the work was tested. Insurers, buyers, tenants and building control may ask for them. An EICR gives observations classification codes: C1 means danger is present, C2 means potentially dangerous, C3 means improvement is recommended, and FI means further investigation is needed.
What Are the Companion Guides to BS 7671?
Several publications help people apply the standard. They explain it but do not replace it.
- On-Site Guide: a condensed guide for routine installations up to 100 A.
- IET Guidance Notes: a series that expands on selection, erection, inspection and testing and other topics.
- IET Design Guide: worked support for designers sizing circuits and protection.
- In-Service Inspection and Testing Code of Practice: guidance on testing equipment already in use.
- Solar PV and EV Charging Codes of Practice: practical guidance for these growing installation types.
- Wiring Matters: the IET’s magazine, which covers technical updates and interpretations.
Where Can You Buy BS 7671 or Access It Online?
Where can you buy the latest BS 7671 book?
Buy the Orange Book from the IET bookshop or one of its trusted resellers. BSI sells the standard through its shop too. The IET warns that fake copies of BS 7671 are in circulation, so buy from official or trusted sources.
Is BS 7671 available as a PDF?
Not as a free download. The IET offers Digital Wiring Regulations subscriptions that give online access to the standard and guidance, and paid digital editions are sold through authorised sellers.
Can you download BS 7671 for free?
We could not confirm any authorised free PDF of the full current standard. Files offered on file-sharing sites are unofficial, may be out of date or incomplete, and can be unsafe to download. We do not link to them.
What free official BS 7671 resources are available?
- The IET’s information pages on Amendment 4 and staying up to date.
- HSE guidance on the Electricity at Work Regulations 1989.
- GOV.UK landlord electrical safety guidance.
- Legislation text on legislation.gov.uk.
- Consumer guides from Electrical Safety First.
What Training or Qualifications Help You Understand BS 7671?
What is the City & Guilds 2382 qualification?
City & Guilds 2382 is the Level 3 Award in the Requirements for Electrical Installations. It is the standard way electricians show they know the current Wiring Regulations.
What is the latest 18th Edition qualification?
The latest version is City & Guilds 2382-26, which matches BS 7671:2018+A4:2026 and replaces 2382-22 (Amendment 3). Providers describe it as a two-hour, open-book online multiple-choice exam. Electricians who already hold an earlier 2382 qualification keep it, but update courses are widely offered.
Why do electricians need to keep up with amendments?
Amendments change what counts as correct work. Certificates and reports must now be issued to Amendment 4, so out-of-date knowledge puts work and reputations at risk.
Does passing a BS 7671 course automatically make someone competent?
No. The 2382 exam tests knowledge of the standard. Competence also needs practical skills, experience and the ability to inspect and test safely. The Electricity at Work Regulations require people to be competent to prevent danger and injury.
Does BS 7671 Apply Outside the UK?
BS 7671 is a UK national standard, not a universal electrical code. Many countries have their own national rules, often related to the international IEC 60364 series. BS 7671 itself takes account of European CENELEC agreements that follow the same family of ideas.
| Country or region | Main national rules | Relationship to BS 7671 |
|---|---|---|
| International | IEC 60364 | Common technical basis for many national codes. Not identical to BS 7671. |
| India | IS 732 | Separate national code of practice for wiring installations. |
| Ireland | I.S. 10101 | Separate national rules for electrical installations. |
| Australia and New Zealand | AS/NZS 3000 (Wiring Rules) | Separate joint standard. |
| United States | National Electrical Code (NEC) | Separate code, updated on a three-year cycle. |
| United Arab Emirates | Emirate-level rules, such as DEWA in Dubai and the Abu Dhabi regulations | Local rules, some of which draw on BS 7671’s principles. Local rules prevail where they differ. |
In short, being qualified in BS 7671 does not mean you can work to another country’s code, and the reverse is true as well.
Common Misconceptions About BS 7671
| Myth | Reality |
|---|---|
| BS 7671 is the same as Part P. | Part P is a Building Regulations requirement. BS 7671 is the technical standard behind it. |
| BS 7671 is a law. | It is non-statutory. Following it is a recognised way to meet legal duties. |
| Every amendment means rewiring. | Amendments apply to new work. Older installations are judged on safety. |
| Amendment 4 means the 19th Edition. | It is the 18th Edition, updated. |
| AFDDs and arc-flash protection are the same. | AFDDs reduce fire risk from arcing in wiring. Arc flash is a hazard to people working on live equipment. |
| The full standard is a free PDF. | No authorised free full PDF was found. |
| A 2382 pass proves full competence. | It proves knowledge of the standard, not practical skill. |
Frequently Asked Questions About BS 7671
What is BS 7671 in simple terms?
It is the UK standard that tells electricians how to design, install, inspect and test electrical installations safely. It is also called the IET Wiring Regulations.
What does BS 7671 stand for?
BS means British Standard. 7671 is the standard’s reference number.
Who publishes the IET Wiring Regulations?
The IET and BSI publish them jointly.
What is the latest edition of BS 7671?
The 18th Edition, updated by Amendment 4:2026. There is no 19th Edition.
Is BS 7671:2018+A4:2026 the current standard?
Yes. It was published on 15 April 2026 and became the only valid version when the previous one was withdrawn on 15 October 2026.
Is the 18th Edition still valid?
Yes. Amendment 4 updates it rather than replacing it.
Is BS 7671 legally required?
No. It is non-statutory. But following it is a recognised way to meet duties under laws such as the Electricity at Work Regulations 1989.
Can I download BS 7671 for free?
We could not confirm any authorised free PDF of the full standard. Buy it from the IET or a trusted reseller, or use a paid digital subscription.
What is the difference between BS 7671 and Part P?
BS 7671 is the technical standard. Part P is a Building Regulations requirement for electrical safety in dwellings in England and Wales.
What is Section 712 in BS 7671?
It sets requirements for solar photovoltaic power supply systems.
What is Section 722 in BS 7671?
It covers electric vehicle charging installations.
Does a new amendment mean an existing installation must be upgraded?
No. Amendments apply to new work and alterations. Older installations are judged on whether they are safe.
What is the difference between an EIC and EICR?
An EIC certifies a new installation or major alteration. An EICR reports on the condition of an existing one.
Does BS 7671 apply in India?
No. India has its own code, IS 732. BS 7671 is a UK national standard.
Final Thoughts: Why Is Understanding BS 7671 Important?
BS 7671 is how the UK keeps electrical installations safe. It is the 18th Edition as amended in 2026, it is a standard rather than a law, and it sits alongside separate legal duties such as Part P and landlord regulations. Professionals should work to the current version, and electrical work should be carried out by competent people.
For installation-specific decisions, consult the authorised current standard and a qualified electrician.
Sources: IET and BSI press release, 15 April 2026; IET: ensure you are up to date with BS 7671; NICEIC: Amendment 4 guide; HSE: Electricity at Work Regulations 1989 guidance (HSR25); GOV.UK: electrical safety standards in the private and social rented sectors; legislation.gov.uk: draft 2026 amendment regulations (England); IET: Part P; Electrical Safety First: England statistics.
This article provides general information about BS 7671 and the IET Wiring Regulations. It is not a substitute for the authorised standard, professional electrical advice or applicable legal requirements. Electrical installation, inspection and testing should be undertaken by appropriately competent persons.
