Electrical panel clearance under NEC 110.26 is a clear working space at least 3 feet deep, 30 inches wide (or the width of the equipment, if greater) and 6.5 feet high. At 151 to 600 volts to ground, the depth rises to 3.5 or 4 feet depending on what faces the panel. The door must also be able to open at least 90 degrees, and the space cannot be used for storage.
| Nominal voltage to ground | Condition 1 | Condition 2 | Condition 3 |
|---|---|---|---|
| 0 to 150 V | 3 ft | 3 ft | 3 ft |
| 151 to 600 V | 3 ft | 3.5 ft | 4 ft |
| 601 to 1,000 V | 3 ft | 4 ft | 5 ft |
What NEC 110.26 Requires
NEC 110.26 exists so a person can examine, adjust, service or maintain equipment while it may be energized, and get away quickly if something goes wrong. The rule applies to equipment likely to need that work, including panelboards, switches, circuit breakers, switchgear, controllers and HVAC controls.
| Dimension | Minimum | Key detail |
|---|---|---|
| Depth | 3 to 4 ft up to 600 V | Set by voltage to ground and condition |
| Width | 30 in. or equipment width | Use the greater value; may be offset from the panel |
| Height | 6.5 ft or equipment height | Use the greater value |
| Door swing | 90° | Doors and hinged panels must be able to open at least 90° |
| Floor | Clear and level | Keep the floor in the working space clear and level |
Depth is measured from exposed live parts, or from the front of the enclosure when the live parts are enclosed. Associated equipment above or below the panel, such as a wireway, may extend up to 6 inches past the front of the panel within the working height.
How to Choose Condition 1, 2 or 3
The condition describes what is on the opposite side of the working space. Getting it wrong is an easy way to end up with too little depth.
| Condition | What faces the equipment | Typical example |
|---|---|---|
| Condition 1 | No live or grounded parts, or live parts effectively guarded by insulation | Panel facing an insulated, non-conductive surface |
| Condition 2 | Grounded parts. Concrete, brick and tile count as grounded | Panel facing a concrete block wall |
| Condition 3 | Exposed live parts on both sides | Two panels facing each other across an aisle |
Worked Examples
| Installation | Voltage row | Condition | Minimum depth |
|---|---|---|---|
| 208Y/120 V panel facing drywall | 0 to 150 V | Any | 3 ft |
| 480Y/277 V panel facing a concrete wall | 151 to 600 V | 2 | 3.5 ft |
| Two 480Y/277 V panels facing each other | 151 to 600 V | 3 | 4 ft |
The second example catches people out. The system is called 480 V, but its voltage to ground is 277 V, which still falls in the 151 to 600 V row. The concrete wall makes it Condition 2, so a 36 inch aisle is 6 inches too shallow. For a 24 inch wide panel in the same room, the width is still 30 inches because that is the greater value.
Keep the Working Space Clear
The required working space must not be used for storage. That includes temporary items such as boxes, ladders, carts and cleaning supplies. If normally enclosed live parts are exposed in a passageway or general open area, the working space must be suitably guarded while they are open.
- Mark the floor so the clear zone is obvious.
- Include panel access in housekeeping checks.
- Keep doors, racks and new equipment from moving into the zone.
- Recheck clearance after any room layout change.
Blocked access also slows emergency isolation. Good clearance supports the safe work practices in our guides to arc flash, lockout/tagout and electrical safety PPE.
Entrance and Egress for Large Equipment
Every working space needs at least one entrance of sufficient area. Larger equipment adds stricter rules because a worker may need to get out quickly from either end of the lineup.
| Trigger | Requirement |
|---|---|
| Equipment rated 1,200 A or more and over 6 ft wide | An entrance at least 24 in. wide and 6.5 ft high at each end of the working space |
| Continuous, unobstructed exit path | One entrance may be permitted |
| Working space depth doubled | One entrance may be permitted, with its nearest edge at least the required depth from the equipment |
| Equipment rated 800 A or more, personnel door less than 25 ft from the working space | Door opens in the direction of egress with listed panic or fire exit hardware |
Recent code text also addresses equipment doors, which must not impede entry to or exit from the working space. Check this on long lineups, where an open door can block the only path out. Equipment such as switchgear panels and switchgear assemblies often needs this review.
Dedicated Equipment Space
Working space is for people. Dedicated equipment space protects the electrical installation itself. Indoors, the space equal to the width and depth of the equipment, from the floor to 6 feet above the equipment or to the structural ceiling, whichever is lower, is reserved for electrical use.
| Item | Rule |
|---|---|
| Equipment covered | Service equipment, switchboards, switchgear, panelboards and motor control centers |
| Foreign systems | Pipes, ducts and unrelated equipment stay out of the dedicated zone |
| Above the zone | Foreign systems need protection against condensation, leaks and breaks |
| Suspended ceiling | A dropped or suspended ceiling is not a structural ceiling |
| Outdoors | Use suitable enclosures and protect from unauthorized people, vehicles and piping leaks |
Local rules can go further. Baltimore’s adopted code, for example, extends the indoor dedicated space to the structural ceiling and adds the required working space to it.
Lighting and OSHA Requirements
Indoor working spaces around service equipment, switchboards, panelboards and motor control centers need illumination. OSHA 29 CFR 1910.303(g) accepts an adjacent light source, but lighting in electric equipment rooms cannot be controlled by automatic means only.
OSHA also sets workplace requirements for equipment at 600 V or less. It requires a 30 inch minimum width, a 90 degree door opening and no storage in the working space. Headroom is 6.5 feet for installations built on or after August 13, 2007, and 6.25 feet for older ones.
To check whether the lighting over a working space is enough, convert fixture output with lux to lumens.
Frequently Asked Questions
How much clearance is required in front of an electrical panel?
At least 3 feet deep, 30 inches wide and 6.5 feet high for typical panels up to 150 volts to ground. At 151 to 600 volts to ground, the depth is 3, 3.5 or 4 feet depending on the condition.
What is the 36 inch rule for electrical panels?
It is the common name for the 3 foot minimum working depth in NEC Table 110.26(A)(1). It is only the minimum, and 480 V equipment facing a concrete wall needs 3.5 feet.
Does the panel have to be centered in the 30 inch width?
No. The working space can be centered on the equipment or offset, as long as it is at least 30 inches wide or the width of the equipment, whichever is greater, and the door can open at least 90 degrees.
Can I store things in front of an electrical panel?
No. The required working space cannot be used for storage, even temporarily. Boxes, shelves, carts and equipment all block safe access.
Does a concrete wall change the required clearance?
Yes. Concrete, brick and tile walls are treated as grounded. At 151 to 600 volts to ground, that makes the installation Condition 2 and raises the depth from 3 feet to 3.5 feet.
What voltage do I use for Table 110.26(A)(1)?
Use the nominal voltage to ground. A 208Y/120 V panel uses the 0 to 150 V row, while a 480Y/277 V panel uses the 151 to 600 V row.
When does an electrical room need panic hardware?
Under the 2020 NEC text, when equipment rated 800 A or more has overcurrent, switching or control devices and a personnel door is less than 25 feet from the working space. The door must open in the direction of egress and have listed panic or fire exit hardware.
Is the dedicated space the same as the working space?
No. Working space is the clear area in front of the equipment for people. Dedicated space is the footprint of the equipment, extending above it, and is reserved for the electrical installation.
Sources and Further Reading
- OSHA 29 CFR 1910.303: working space, entrances, headroom, lighting and dedicated space.
- SLAC: Electrical Equipment Working Space Requirements: clearance table and conditions.
- IAEI: Working Space Requirements for Electrical Panelboards: 2020 NEC depth, width and height.
- EC&M: Access to and Egress From Working Space: large equipment and door hardware.
- EC&M: General Requirements of the NEC, Part 14: dedicated equipment space.
- EC&M: General Requirements of the NEC, Part 12: working space, floors and equipment doors.
- Consulting-Specifying Engineer: Sizing an Electrical Room: applying clearances in room design.
- Baltimore City Code, Section 110.26: an example of a local amendment.