Class 1 Division 1 is a hazardous location where ignitable flammable gases or vapors may be present during normal operation. Electrical equipment there must be approved for the location, conduit must be threaded and wrench-tight, and raceway seals are required at specific points to stop gas and flame from traveling through the system. In the US, the rules come from OSHA 1910.307 and NEC Article 501.

Critical safety warning: A wiring error in a classified area can ignite an explosion. This guide is an overview for understanding the requirements. Design, installation and inspection must be carried out by qualified people using the adopted code, the area classification drawings and the manufacturer’s instructions.
RequirementSummaryReference
EquipmentApproved for the class, group and temperatureOSHA 1910.307(c)
ProtectionExplosionproof, purged and pressurized, intrinsically safe or other approved techniqueOSHA 1910.307(f)
ConduitThreaded and made wrench-tightOSHA 1910.307(d)
Raceway sealsAt specified enclosures and boundariesNEC 501.15
MarkingClass, group and operating temperature or rangeOSHA 1910.307(c)(2)
DocumentationClassified areas documented where requiredOSHA 1910.307(b)
A summary. Read the full text and your adopted NEC edition.

What Class 1 Division 1 Means

The name has two parts. Class I means flammable gases or vapors may be present in the air in quantities that could produce explosive or ignitable mixtures. Division 1 describes how likely that is. Under OSHA 1910.399, a location is Class I, Division 1 if any of these applies:

  • Ignitable concentrations may exist under normal operating conditions.
  • They may exist frequently because of repair, maintenance or leakage.
  • A breakdown or faulty operation might release them and could also cause electrical equipment to fail at the same time.

A Division 2 location is less likely to have gas present. Flammable materials are normally confined in closed systems, ignitable concentrations are normally prevented by positive mechanical ventilation, or the area adjoins a Division 1 location.

Divisions vs Zones

Division and zone comparisonZone 0 and Zone 1 broadly align with Division 1, and Zone 2 broadly aligns with Division 2. The definitions are not identical.How divisions and zones line upLikelihood of gasZone systemDivision systemContinuous or long periodsZone 0Likely in normal operationZone 1Not likely, short durationZone 2Division 1Division 2IndustrialBasicsindustrialbasics.com
Figure 1: A broad comparison only. Always use the classification on the area’s documentation.

OSHA allows a Class I installation to use either the division system or the zone system. The zone system splits the highest-risk conditions more finely:

ZoneOSHA descriptionProtection techniques in 1910.307(g)
Zone 0Present continuously or for long periodsIntrinsic safety
Zone 1Likely in normal operation, or frequent through repair or leakageFlameproof “d”, purged and pressurized, intrinsic safety, oil “o”, increased safety “e”, encapsulation “m”, powder “q”
Zone 2Not likely in normal operation, and short-lived if it occursPurged and pressurized, type “n”, plus higher-zone equipment for the same gas
From OSHA 1910.307 and 1910.399. Equipment must be approved for the specific location.
Reader tip: Do not mix the systems casually. OSHA says Zone 0 or Zone 1 locations may not abut Division 1 or Division 2 locations, and Zone 2 may abut but not overlap Division 2. A reclassification must cover all of the space classified because of a single gas or vapor source.

Protection Techniques for Division 1

TechniqueHow it worksPractical note
ExplosionproofThe enclosure is built to contain an internal explosionDamaged joints or missing bolts defeat it
Purged and pressurizedClean air or inert gas keeps flammable gas outDepends on maintaining the supply
Intrinsically safeLimits energy so a circuit cannot ignite the gasCommon for instruments and 4-20 mA loops
OSHA permits each where the equipment is approved for the location.

Every item must be approved for the specific location. A general-purpose sensor, junction box or motor starter cannot simply be placed inside the area. OSHA also requires equipment to be marked with its class, group and operating temperature or range, based on a 40 °C ambient unless otherwise marked.

Wiring and Conduit Requirements

OSHA 1910.307(d) states that all conduits shall be threaded and shall be made wrench-tight. If a threaded joint cannot be made tight, a bonding jumper is required. The tight joint matters because fault current through a loose connection can spark inside the hazardous area.

The permitted wiring methods are listed in NEC Article 501 and can change between editions, so we do not reproduce them here. Check the current text before you select conduit or cable. Bonding also matters, and our guide to earthing and grounding covers the basics.

Raceway Seal Rules

Raceway seal locationsA seal is placed near an explosionproof enclosure where required, and another seal is placed in the raceway within 10 feet of the Division 1 boundary.Where raceway seals go in Class I, Division 1Class I, Division 1UnclassifiedExplosionproofenclosureSEnclosure sealWithin 18 in.*SBoundary sealWithin 10 ft of boundary*Where an enclosure seal is required. See the table below.IndustrialBasicsindustrialbasics.com
Figure 2: Simplified layout. Exceptions apply, so check Section 501.15 of your adopted NEC.

A seal limits the passage of gas and stops an explosion from traveling through the conduit. These points come from EC&M’s explanation of NEC 501.15, which does not name a code edition:

Situation in Division 1Seal rule
Raceway enters an explosionproof enclosure with make-and-break contactsSeal required
Size 1/2 to 1-1/2 raceway enters a box with no make-and-break contactsNot required under this rule
Size 2 or larger raceway enters a junction or splice boxSeal within 18 in. of the enclosure
Raceway leaves the Division 1 locationSeal within 10 ft of the boundary, with exceptions
Sealing compound thicknessAt least the trade size of the fitting, and never under 5/8 in.
Conductor fill in the sealUp to 25% of the same size RMC, unless identified for more
Splices and tapsNot allowed inside a seal fitting
Summary of Section 501.15 from EC&M (2016). Confirm with your adopted NEC and the fitting instructions.

Worked example: checking three raceways

RacewayEnclosureResult
1 in.Explosionproof box with a contactor (make-and-break contacts)Seal required
1 in.Explosionproof box with terminals onlyNo enclosure seal under this rule
2 in.Explosionproof splice boxSeal within 18 in.
Illustrative examples. Any raceway leaving the Division 1 area also needs its boundary seal.

For the compound, a 1 in. fitting needs at least 1 in. of compound. A 1/2 in. fitting still needs 5/8 in., because that is the minimum. Follow the fitting maker’s instructions for dams, mixing and curing.

How to Read Equipment Markings

Zone marking exampleThe marking Class I, Zone 0, AEx ia IIC T6 shows the class, zone, AEx symbol, protection technique, gas group and temperature class.Reading a zone equipment markingClass IGas or vaporZone 0Zone ratingAExUS zone symboliaIntrinsic safetyIICGas groupT6Temperature classIndustrialBasicsindustrialbasics.com
Figure 3: The example marking and order given in OSHA 1910.307(g)(5).

Zone equipment is marked in a fixed order: class, zone, AEx symbol, protection technique, gas group and temperature class. Confirm that the zone, gas group and temperature class all suit the area. The temperature class must be safe for the specific gas or vapor, which is why the classification documents need to identify it.

Practical Checklist

  1. Get the area classification drawing and confirm the class, division or zone, and group.
  2. Check every device’s marking against that classification.
  3. Confirm the wiring method in your adopted NEC.
  4. Locate every seal, including boundary seals.
  5. Make all conduit joints wrench-tight and check bonding.
  6. Pour and inspect seals to the manufacturer’s instructions.
  7. Isolate power and verify the atmosphere under your site’s permit system before opening equipment, with lockout/tagout applied.
  8. Keep enclosure joints clean and all bolts fitted during maintenance.

Classified areas carry risks beyond ignition, so also review electrical hazards in industry and arc flash. UK and European sites generally work to different rules, so this US guide should not be used for them.

Frequently Asked Questions

What is a Class 1 Division 1 location?

It is an area where ignitable concentrations of flammable gases or vapors may exist in normal operation, frequently because of repair, maintenance or leakage, or when a breakdown could release gas and also fault electrical equipment.

What is the difference between Class 1 Division 1 and Division 2?

In Division 1, ignitable gas may exist during normal operation. In Division 2, it is normally confined or prevented by ventilation, or the area is next to a Division 1 location.

Is Division 1 the same as Zone 1?

No. Division 1 broadly covers conditions that the zone system splits into Zone 0 and Zone 1. Do not swap one for the other without an engineered reclassification.

What protection methods are allowed in Class 1 Division 1?

OSHA permits equipment approved for the location, including explosionproof, purged and pressurized, and intrinsically safe equipment.

Can Division 1 equipment be used in Division 2?

Yes. OSHA permits equipment approved for Division 1 in a Division 2 location of the same class and group.

When is a conduit seal required in Division 1?

Commonly where a raceway enters an explosionproof enclosure with make-and-break contacts, where a size 2 or larger raceway enters a box with splices or taps, and where it leaves the Division 1 area.

How far can a seal be from the boundary?

EC&M’s summary of NEC 501.15 gives within 10 ft of the Class I, Division 1 boundary, with exceptions.

Who decides an area’s classification?

Classification should be done by qualified engineers and documented. Under OSHA, zone classification work must be supervised by a qualified registered professional engineer.