NEC Article 250 is the National Electrical Code’s grounding and bonding article. It sets which systems must be grounded and where the system is bonded to ground. It sets how electrodes are installed, and how grounding electrode conductors, bonding jumpers and equipment grounding conductors are sized. It is split into 10 parts. Most sizing questions come down to three tables: 250.66 for the grounding electrode conductor, 250.102(C)(1) for bonding jumpers and the minimum neutral, and 250.122 for equipment grounding conductors.
The 10 Parts of Article 250
| Part | Title | Key sections |
|---|---|---|
| I | General | Scope, definitions-based performance rules (250.4), objectionable current (250.6), connection methods (250.8), clean surfaces (250.12) |
| II | System Grounding | Which systems must or may be grounded (250.20, 250.21), service grounding (250.24), main and system bonding jumpers (250.28), separately derived systems (250.30), buildings fed by a feeder (250.32) |
| III | Grounding Electrode System and Grounding Electrode Conductor | Electrodes (250.52), installation and the supplemental electrode (250.53), GEC installation (250.64) and sizing (250.66), connections (250.68) |
| IV | Enclosure, Raceway, and Service Cable Connections | Grounding of service and other enclosures and raceways |
| V | Bonding | Bonding at the service (250.92, 250.94), loosely jointed raceways (250.98), bonding conductors and jumpers (250.102), piping and structural metal (250.104), lightning protection (250.106) |
| VI | Equipment Grounding and Equipment Grounding Conductors | Types of EGC (250.118), identification (250.119), installation (250.120), sizing (250.122) |
| VII | Methods of Equipment Grounding Conductor Connections | Receptacle grounding terminals (250.146), EGCs in boxes (250.148) |
| VIII | Direct-Current Systems | DC system grounding (250.162) and DC GEC sizing (250.166) |
| IX | Instruments, Meters, and Relays | Instrument transformer circuits and cases (250.170 to 250.178) |
| X | Grounding of Systems and Circuits over 1000 Volts | Medium- and high-voltage system and equipment grounding |
Part I sets performance goals: 250.4(A)(1) says grounded systems are connected to earth to limit the voltage from lightning, line surges or contact with higher-voltage lines, and to stabilize voltage to earth. The rest of the article gives the prescriptive methods that achieve those goals. For the difference between earthing and grounding terms, see earthing vs grounding.
Which Conductor Is Sized by Which Table
| Conductor | Where | Sized from | Based on |
|---|---|---|---|
| Grounding electrode conductor (GEC) | Service, 250.24; SDS, 250.30(A)(5) | Table 250.66 → NEC 250.66 guide | Largest ungrounded service or derived conductor (or equivalent parallel area) |
| Main bonding jumper (service) | 250.28(D) | Table 250.102(C)(1) | Largest ungrounded service conductor |
| System bonding jumper (SDS) | 250.28(D), 250.30(A)(1) | Table 250.102(C)(1) | Largest ungrounded derived conductor |
| Supply-side bonding jumper | 250.102(C), 250.30(A)(2) | Table 250.102(C)(1) | Ungrounded conductor area in the raceway or cable |
| Minimum grounded (neutral) service conductor | 250.24 | Table 250.102(C)(1) | Largest ungrounded service conductor |
| Load-side equipment bonding jumper | 250.102(D) | Table 250.122 | Largest overcurrent device rating |
| Equipment grounding conductor (EGC) | 250.122 | Table 250.122 → ground wire size chart | Overcurrent device rating ahead of the circuit |
| Receptacle bonding jumper | 250.146 | Table 250.122 | Overcurrent device rating |
The split matters. Tables 250.66 and 250.102(C)(1) key on conductor size, because these conductors carry fault current on the supply side, before the overcurrent device. Table 250.122 keys on the breaker or fuse rating, because the EGC only has to carry fault current until that device opens (IAEI).
IAEI gives worked examples. 250 kcmil copper service conductors need a 2 AWG copper supply-side bonding jumper or minimum neutral. Three 250 kcmil copper per phase in parallel (750 kcmil equivalent) need 2/0 copper. A 225 A feeder needs a 4 AWG copper EGC, read from the 300 A row of Table 250.122. A single-service GEC is never required to be larger than 3/0 copper or 250 kcmil aluminum.
12½ Percent Rule Calculator
Separately Derived Systems: 250.30
A separately derived system (SDS) has no direct connection to another source’s circuit conductors except through grounding and bonding (Article 100). Except for autotransformers, transformers are separately derived because primary and secondary windings are not electrically connected. A generator whose transfer switch does not switch the neutral is not separately derived (250.30, Informational Note 1).
- System bonding jumper, 250.30(A)(1): connects the derived neutral to the equipment grounding conductor, supply-side bonding jumper, or both. It goes at the source or at the first disconnect, not both, and is sized per 250.102(C).
- Supply-side bonding jumper, 250.30(A)(2): runs from the transformer enclosure to the disconnect enclosure. RMC, IMC or EMT may serve. A nonmetallic or flexible raceway needs a wire-type jumper sized from Table 250.102(C)(1).
- Grounded conductor, 250.30(A)(3): if the bond is at the disconnect, the neutral must run with the phase conductors and be sized from Table 250.102(C)(1); in parallel raceways, never smaller than 1/0 AWG.
- Grounding electrode, 250.30(A)(4): an indoor SDS uses the building grounding electrode system; an outdoor source follows 250.30(C).
- GEC, 250.30(A)(5): sized per 250.66 from the derived conductors, and terminated at the same point as the system bonding jumper.
- Multiple SDSs, 250.30(A)(6): GEC taps from each source to a common GEC are permitted, with accessible connections made by approved methods such as exothermic welding.
For the earthing-system layouts behind these rules, see types of earthing systems and corner grounded delta. To detect insulation failures on grounded systems, see ground fault relays.
Other Frequently Cited Sections
250.20: Systems required to be grounded
AC systems under 50 V must be grounded if supplied by a transformer whose supply exceeds 150 V to ground or is ungrounded, or if run overhead outside [250.20(A)]. Ungrounded systems must be legibly marked “Caution: Ungrounded System Operating — ___ Volts Between Conductors” at the source or first disconnect [250.21(C)]. Impedance-grounded systems follow 250.36 or 250.187.
250.52 and 250.53: Grounding electrodes
Recognized electrodes include underground metal water pipe, metal in-ground support structures, concrete-encased electrodes (see Ufer ground), ground rings, and rod, pipe and plate electrodes. A single rod, pipe or plate must be supplemented by another electrode unless its resistance is 25 ohms or less [250.53(A)(2)]. Multiple rods must be at least 6 ft apart; spacing them twice the rod length improves paralleling efficiency [250.53(A)(3)].
250.119: Identifying equipment grounding conductors
EGCs may be bare, covered or insulated. Covered or insulated EGCs must have a continuous green finish or green with one or more yellow stripes. Conductors with that marking must not be used as ungrounded or grounded circuit conductors.
250.146: Receptacle grounding terminal
An equipment bonding jumper sized from Table 250.122 must connect a grounding-type receptacle’s terminal to a grounded metal box, unless an exception in 250.146(A) through (D) applies. 250.146(D) covers isolated-ground receptacles, whose EGC is not required to terminate on the box (Mike Holt, EC&M).
250.148: EGCs in boxes
Where conductors are spliced or terminated in a box, all EGCs spliced or terminated there must be connected together. Removing a luminaire or receptacle must not interrupt the ground-fault path. In a metal box, the EGC connects to the box with a screw used for no other purpose or a listed fitting or device. An EGC passing through unspliced need not be joined to the others. Mike Holt notes an EGC may not terminate on a plaster-ring screw. For box sizing, see box fill chart.
Frequently Asked Questions
What is NEC Article 250?
Article 250 of NFPA 70, the National Electrical Code, covers grounding and bonding: which systems must be grounded, where the grounding connections are made, the types and sizes of grounding and bonding conductors and electrodes, and the methods of grounding and bonding (250.1).
What section of the NEC covers grounding?
Article 250, Grounding and Bonding. It is divided into 10 parts, from Part I (General) to Part X (systems over 1000 volts).
What is a separately derived system?
A power source with no direct connection to the circuit conductors of any other source, other than through grounding and bonding connections (Article 100). Most transformers other than autotransformers are separately derived; a generator is not if its neutral stays solidly connected to the service neutral through the transfer switch.
Where does the system bonding jumper go?
At the secondary neutral point of the source or at the neutral terminal of the first disconnect, not both [250.30(A)(1)]. The grounding electrode conductor must terminate at the same point [250.30(A)(5)].
What does Table 250.102(C)(1) size?
The grounded (neutral) service conductor minimum, main bonding jumpers, system bonding jumpers and supply-side bonding jumpers, based on the size of the largest ungrounded conductor or the equivalent area of parallel conductors.
What is the 12½ percent rule?
Note 1 to Table 250.102(C)(1): above 1100 kcmil copper or 1750 kcmil aluminum, the conductor must have an area of at least 12.5% of the ungrounded conductor area. Six 4/0 copper per phase (1,269,600 cmil) need at least 158,700 cmil, which is 3/0 copper (IAEI).
What is the difference between 250.66 and 250.122?
Table 250.66 sizes the grounding electrode conductor from the size of the service or derived conductors. Table 250.122 sizes equipment grounding conductors from the rating of the overcurrent device ahead of the circuit.
Which type of system is required to be grounded?
Under 250.20, systems of less than 50 V must be grounded if fed by a transformer whose supply exceeds 150 V to ground or is ungrounded, or if run overhead outdoors.
What does 250.146 require?
An equipment bonding jumper, sized from Table 250.122, from the receptacle grounding terminal to a grounded metal box, unless one of the exceptions in 250.146(A) through (D) applies, such as a listed self-grounding receptacle in a flush box.
What does 250.148 require?
Where circuit conductors are spliced or terminated in a box, all equipment grounding conductors spliced or terminated there must be connected together. Removing a device must not break the ground path, and in a metal box an EGC must connect to the box by a means used for no other purpose.
Sources and Further Reading
- American Electrical Institute: Article 250 (2023 NEC) course: part list and section text quoted from the 2023 NEC.
- EC&M (Mike Holt): NEC Requirements for Grounding of Separately Derived Systems.
- EC&M (Mike Holt): NEC Rules for Grounding and Bonding Transformers.
- IAEI Magazine: Sizing of Conductors Related to Grounding and Bonding: tables, worked examples, 12½ percent rule.
- EC&M (Mike Holt): Attachment of Equipment Grounding Conductor to Box.
- Electrical License Renewal: 250.148 Continuity of EGCs in Boxes: 2023 code language.