NEC Article 250 is the National Electrical Code’s grounding and bonding article. It sets which systems must be grounded and where the system is bonded to ground. It sets how electrodes are installed, and how grounding electrode conductors, bonding jumpers and equipment grounding conductors are sized. It is split into 10 parts. Most sizing questions come down to three tables: 250.66 for the grounding electrode conductor, 250.102(C)(1) for bonding jumpers and the minimum neutral, and 250.122 for equipment grounding conductors.

10
parts in Article 250
250.66
GEC sizing table
250.102(C)(1)
bonding jumpers, neutral
250.122
EGC by OCPD rating
Code note: This is a study guide, not the Code. Section numbers here follow the 2023 NEC as quoted in the sources. Requirements change between editions and with local amendments. Grounding work must follow the edition your jurisdiction adopted and be checked by a qualified electrician or the inspector.

The 10 Parts of Article 250

PartTitleKey sections
IGeneralScope, definitions-based performance rules (250.4), objectionable current (250.6), connection methods (250.8), clean surfaces (250.12)
IISystem GroundingWhich systems must or may be grounded (250.20, 250.21), service grounding (250.24), main and system bonding jumpers (250.28), separately derived systems (250.30), buildings fed by a feeder (250.32)
IIIGrounding Electrode System and Grounding Electrode ConductorElectrodes (250.52), installation and the supplemental electrode (250.53), GEC installation (250.64) and sizing (250.66), connections (250.68)
IVEnclosure, Raceway, and Service Cable ConnectionsGrounding of service and other enclosures and raceways
VBondingBonding at the service (250.92, 250.94), loosely jointed raceways (250.98), bonding conductors and jumpers (250.102), piping and structural metal (250.104), lightning protection (250.106)
VIEquipment Grounding and Equipment Grounding ConductorsTypes of EGC (250.118), identification (250.119), installation (250.120), sizing (250.122)
VIIMethods of Equipment Grounding Conductor ConnectionsReceptacle grounding terminals (250.146), EGCs in boxes (250.148)
VIIIDirect-Current SystemsDC system grounding (250.162) and DC GEC sizing (250.166)
IXInstruments, Meters, and RelaysInstrument transformer circuits and cases (250.170 to 250.178)
XGrounding of Systems and Circuits over 1000 VoltsMedium- and high-voltage system and equipment grounding
Part titles from the American Electrical Institute 2023 Article 250 course; key sections are those discussed in the sources below.

Part I sets performance goals: 250.4(A)(1) says grounded systems are connected to earth to limit the voltage from lightning, line surges or contact with higher-voltage lines, and to stabilize voltage to earth. The rest of the article gives the prescriptive methods that achieve those goals. For the difference between earthing and grounding terms, see earthing vs grounding.

Which Conductor Is Sized by Which Table

ConductorWhereSized fromBased on
Grounding electrode conductor (GEC)Service, 250.24; SDS, 250.30(A)(5)Table 250.66 → NEC 250.66 guideLargest ungrounded service or derived conductor (or equivalent parallel area)
Main bonding jumper (service)250.28(D)Table 250.102(C)(1)Largest ungrounded service conductor
System bonding jumper (SDS)250.28(D), 250.30(A)(1)Table 250.102(C)(1)Largest ungrounded derived conductor
Supply-side bonding jumper250.102(C), 250.30(A)(2)Table 250.102(C)(1)Ungrounded conductor area in the raceway or cable
Minimum grounded (neutral) service conductor250.24Table 250.102(C)(1)Largest ungrounded service conductor
Load-side equipment bonding jumper250.102(D)Table 250.122Largest overcurrent device rating
Equipment grounding conductor (EGC)250.122Table 250.122 → ground wire size chartOvercurrent device rating ahead of the circuit
Receptacle bonding jumper250.146Table 250.122Overcurrent device rating
Sizing map compiled from IAEI Magazine (Sizing of Conductors Related to Grounding and Bonding) and the AEI 2023 Article 250 course.

The split matters. Tables 250.66 and 250.102(C)(1) key on conductor size, because these conductors carry fault current on the supply side, before the overcurrent device. Table 250.122 keys on the breaker or fuse rating, because the EGC only has to carry fault current until that device opens (IAEI).

IAEI gives worked examples. 250 kcmil copper service conductors need a 2 AWG copper supply-side bonding jumper or minimum neutral. Three 250 kcmil copper per phase in parallel (750 kcmil equivalent) need 2/0 copper. A 225 A feeder needs a 4 AWG copper EGC, read from the 300 A row of Table 250.122. A single-service GEC is never required to be larger than 3/0 copper or 250 kcmil aluminum.

12½ Percent Rule Calculator

12½ Percent Rule Check (Table 250.102(C)(1), Note 1)
IndustrialBasics calculator. Areas from NEC Chapter 9, Table 8. Above 1100 kcmil copper or 1750 kcmil aluminum, the grounded conductor, main or system bonding jumper, or supply-side bonding jumper must have at least 12.5% of the phase area (IAEI). Same material as the phase conductors; for mixed materials see Note 2. For parallel raceways, 250.102(C)(2) sizes each raceway separately. Check against the NEC edition your jurisdiction adopted.

Separately Derived Systems: 250.30

Grounding and bonding a separately derived systemDiagram of a transformer separately derived system. The secondary neutral X0 is bonded to the transformer enclosure by the system bonding jumper; the grounding electrode conductor runs from that same point to the building grounding electrode system; a supply-side bonding jumper connects the transformer enclosure to the first disconnect, where the neutral bar is not bonded to the equipment grounding bar.Separately derived system: one bond, one GEC connection pointTransformer (source)First disconnectsecondaryX1X2X3X0neutral (grounded conductor)System bondingjumper250.30(A)(1)enclosureGEC 250.30(A)(5), sized 250.66building electrode system 250.30(A)(4)neutral bar (not bonded)EGC barSupply-side bonding jumper 250.30(A)(2)to loadsIndustrialBasicsindustrialbasics.com
Figure 1: System bonding jumper at the source, per the 250.30(A) rules described by Mike Holt in EC&M. The jumper may instead be at the first disconnect, but never at both; the GEC terminates where the jumper is.

A separately derived system (SDS) has no direct connection to another source’s circuit conductors except through grounding and bonding (Article 100). Except for autotransformers, transformers are separately derived because primary and secondary windings are not electrically connected. A generator whose transfer switch does not switch the neutral is not separately derived (250.30, Informational Note 1).

  • System bonding jumper, 250.30(A)(1): connects the derived neutral to the equipment grounding conductor, supply-side bonding jumper, or both. It goes at the source or at the first disconnect, not both, and is sized per 250.102(C).
  • Supply-side bonding jumper, 250.30(A)(2): runs from the transformer enclosure to the disconnect enclosure. RMC, IMC or EMT may serve. A nonmetallic or flexible raceway needs a wire-type jumper sized from Table 250.102(C)(1).
  • Grounded conductor, 250.30(A)(3): if the bond is at the disconnect, the neutral must run with the phase conductors and be sized from Table 250.102(C)(1); in parallel raceways, never smaller than 1/0 AWG.
  • Grounding electrode, 250.30(A)(4): an indoor SDS uses the building grounding electrode system; an outdoor source follows 250.30(C).
  • GEC, 250.30(A)(5): sized per 250.66 from the derived conductors, and terminated at the same point as the system bonding jumper.
  • Multiple SDSs, 250.30(A)(6): GEC taps from each source to a common GEC are permitted, with accessible connections made by approved methods such as exothermic welding.
Field check: Mike Holt warns that a second system bonding jumper, or one placed away from the GEC connection, puts objectionable neutral current on equipment enclosures, metal piping and structural steel, which 250.6(A) prohibits. Downstream of the bond, the neutral must never touch the case or the EGC.

For the earthing-system layouts behind these rules, see types of earthing systems and corner grounded delta. To detect insulation failures on grounded systems, see ground fault relays.

Other Frequently Cited Sections

250.20: Systems required to be grounded

AC systems under 50 V must be grounded if supplied by a transformer whose supply exceeds 150 V to ground or is ungrounded, or if run overhead outside [250.20(A)]. Ungrounded systems must be legibly marked “Caution: Ungrounded System Operating — ___ Volts Between Conductors” at the source or first disconnect [250.21(C)]. Impedance-grounded systems follow 250.36 or 250.187.

250.52 and 250.53: Grounding electrodes

Recognized electrodes include underground metal water pipe, metal in-ground support structures, concrete-encased electrodes (see Ufer ground), ground rings, and rod, pipe and plate electrodes. A single rod, pipe or plate must be supplemented by another electrode unless its resistance is 25 ohms or less [250.53(A)(2)]. Multiple rods must be at least 6 ft apart; spacing them twice the rod length improves paralleling efficiency [250.53(A)(3)].

250.119: Identifying equipment grounding conductors

EGCs may be bare, covered or insulated. Covered or insulated EGCs must have a continuous green finish or green with one or more yellow stripes. Conductors with that marking must not be used as ungrounded or grounded circuit conductors.

250.146: Receptacle grounding terminal

An equipment bonding jumper sized from Table 250.122 must connect a grounding-type receptacle’s terminal to a grounded metal box, unless an exception in 250.146(A) through (D) applies. 250.146(D) covers isolated-ground receptacles, whose EGC is not required to terminate on the box (Mike Holt, EC&M).

250.148: EGCs in boxes

Where conductors are spliced or terminated in a box, all EGCs spliced or terminated there must be connected together. Removing a luminaire or receptacle must not interrupt the ground-fault path. In a metal box, the EGC connects to the box with a screw used for no other purpose or a listed fitting or device. An EGC passing through unspliced need not be joined to the others. Mike Holt notes an EGC may not terminate on a plaster-ring screw. For box sizing, see box fill chart.

Frequently Asked Questions

What is NEC Article 250?

Article 250 of NFPA 70, the National Electrical Code, covers grounding and bonding: which systems must be grounded, where the grounding connections are made, the types and sizes of grounding and bonding conductors and electrodes, and the methods of grounding and bonding (250.1).

What section of the NEC covers grounding?

Article 250, Grounding and Bonding. It is divided into 10 parts, from Part I (General) to Part X (systems over 1000 volts).

What is a separately derived system?

A power source with no direct connection to the circuit conductors of any other source, other than through grounding and bonding connections (Article 100). Most transformers other than autotransformers are separately derived; a generator is not if its neutral stays solidly connected to the service neutral through the transfer switch.

Where does the system bonding jumper go?

At the secondary neutral point of the source or at the neutral terminal of the first disconnect, not both [250.30(A)(1)]. The grounding electrode conductor must terminate at the same point [250.30(A)(5)].

What does Table 250.102(C)(1) size?

The grounded (neutral) service conductor minimum, main bonding jumpers, system bonding jumpers and supply-side bonding jumpers, based on the size of the largest ungrounded conductor or the equivalent area of parallel conductors.

What is the 12½ percent rule?

Note 1 to Table 250.102(C)(1): above 1100 kcmil copper or 1750 kcmil aluminum, the conductor must have an area of at least 12.5% of the ungrounded conductor area. Six 4/0 copper per phase (1,269,600 cmil) need at least 158,700 cmil, which is 3/0 copper (IAEI).

What is the difference between 250.66 and 250.122?

Table 250.66 sizes the grounding electrode conductor from the size of the service or derived conductors. Table 250.122 sizes equipment grounding conductors from the rating of the overcurrent device ahead of the circuit.

Which type of system is required to be grounded?

Under 250.20, systems of less than 50 V must be grounded if fed by a transformer whose supply exceeds 150 V to ground or is ungrounded, or if run overhead outdoors.

What does 250.146 require?

An equipment bonding jumper, sized from Table 250.122, from the receptacle grounding terminal to a grounded metal box, unless one of the exceptions in 250.146(A) through (D) applies, such as a listed self-grounding receptacle in a flush box.

What does 250.148 require?

Where circuit conductors are spliced or terminated in a box, all equipment grounding conductors spliced or terminated there must be connected together. Removing a device must not break the ground path, and in a metal box an EGC must connect to the box by a means used for no other purpose.