A safe PLC sequence for a suction fan, rotary valve and filter purging system starts from the discharge end and stops from the process end. Start the conveyor and rotary valve first, then the fan, then enable filter cleaning. To stop, halt the process, let the fan, cleaning and discharge run on to purge collected dust, stop the fan, then stop the cleaning and discharge last. Every step needs a proof signal before the next one runs.
| Step | Start sequence | Stop sequence |
|---|---|---|
| 1 | Discharge conveyor or bin ready | Process and pick-up points stop |
| 2 | Rotary valve running and proven rotating | Fan, cleaning and discharge run on for the purge time |
| 3 | Suction fan started and proven running | Suction fan stops |
| 4 | Filter cleaning enabled (on ΔP or timer) | Cleaning stops, or downtime cleaning runs |
| 5 | Process released to run | Rotary valve and conveyor stop last |
How the System Fits Together
Dirty air from the process is pulled through the filters by a suction fan on the clean-air side. Filter cleaning, often called purging, fires pulses of compressed air through the filters to knock the dust cake off. Dust falls into the hopper. Donaldson’s manual explains that the rotary valve maintains a seal on the hopper outlet while material is discharged, so air is not drawn up through the dust outlet.
The PLC coordinates the three. If you are new to PLCs, read what is a PLC first. Each motor is usually controlled by a full-voltage starter, as explained in our FVNR starter guide.
The Start and Stop Order
IAC’s baghouse procedure starts the dust removal system first (rotary airlocks, pneumatic conveying or discharge devices) so any residual dust is removed before the main fan starts. The fan comes next, then the bag cleaning mechanism, set to pulse only when the operation or the maker recommends.
To shut down, IAC says to stop the process, then continue running the dust removal conveyor and bag cleaning for 10 to 20 minutes, then stop the main fan, then the cleaning system, and finally the dust removal equipment. For hot gas systems it also advises running the fan briefly after the heat source stops so the gas is cleared and dew point problems are avoided.
Interlocks and Permissives
An interlock stops or blocks a device when a condition is not met. A permissive is a condition that must be true before a start is allowed. Typical signals for this system:
| Signal | Device | Used for |
|---|---|---|
| Conveyor running | Starter auxiliary contact | Permissive for the rotary valve |
| Valve rotating | Zero-speed or rotation sensor | Proves the rotor turns, not just that the contactor closed |
| Hopper high level | Level switch | Stops the fan or alarms before dust backs into the filters |
| Fan running | Starter auxiliary contact or current relay | Permissive for cleaning and the process |
| Filter differential pressure | ΔP transmitter or switch | Starts cleaning and raises a high ΔP alarm |
| Compressed air pressure | Pressure switch | Alarm when cleaning cannot work |
Field contacts reach the PLC through input cards, and motor contactors are often driven through an interposing relay. A dry contact from a level switch or speed sensor is the usual way to bring a proof signal into the PLC. For sensor types, see types of industrial sensors.
Example Ladder Logic
The rungs above show the chain. The rotary valve runs only when its conveyor is running, and stays on while the sequence is active, including the purge run-on. The fan is permitted only when the valve is running, proven rotating and the hopper is not full. If a downstream device drops out, the fan permit drops and the fan stops or the system alarms. In a real program, add:
- Start delays between steps so each motor reaches speed before the next starts.
- Proof timers that raise a fault if a run feedback does not arrive within a set time.
- Latched faults that need an operator reset, so a sequence does not restart by itself.
- A run-on timer for the purge period after the process stops.
A sequence like this suits a step structure. Our guides to SFC action qualifiers and IEC 61131-3 languages show how to build it with timed and stored actions.
Filter Cleaning (Purge) Logic
Donaldson’s Delta P Plus controller shows the three common modes:
| Mode | How it works |
|---|---|
| Differential pressure cleaning | Cleaning starts at the High Pressure On setpoint and stops at the Low Pressure Off setpoint, keeping ΔP in a narrow band |
| Downtime cleaning | After the collector shuts down, a delay lets the blower stop, then cleaning runs for a preselected time |
| Combined | Differential cleaning while running, plus downtime cleaning at shutdown |
Donaldson also sets its alarm point higher than the cleaning start setpoint, with a time delay to prevent nuisance trips. A persistent high ΔP alarm points to a cleaning failure, low compressed air or filters at the end of their life.
On small intermittent-duty collectors, cleaning only happens with the fan off. Donaldson’s Vibra-Shake manual starts cleaning 60 seconds after the fan stops on its smaller models and 180 seconds on the larger ones. This is the fan run-down time. Cleaning before the fan has stopped would just pull the dust straight back onto the filters.
Worked Example: Timer Settings
A collector serves a sanding line. The maker allows downtime cleaning, and the site chooses a 15 minute run-on within IAC’s 10 to 20 minute range.
| Timer | Example setting | Basis |
|---|---|---|
| Conveyor to valve start delay | 5 s | Site choice, lets the conveyor reach speed |
| Valve rotation proof | Fault if not proven within 10 s | Site choice |
| Valve to fan start delay | 5 s | Site choice |
| Purge run-on after process stops | 15 min | Within IAC’s 10 to 20 min |
| Fan run-down before downtime cleaning | Per maker, e.g. 60 s or 180 s | Donaldson Vibra-Shake values |
| Valve and conveyor run after cleaning | Until hopper is empty | IAC: dust removal stops last |
Commissioning Checks
- Check motor rotation on the fan, valve and conveyor. Donaldson’s manuals list a backwards fan as a cause of insufficient airflow.
- Force each fault: stop the conveyor, block the valve speed sensor, trip the high level switch, and confirm the fan reacts as designed.
- Test a power loss mid-sequence and confirm nothing restarts on its own.
- Verify cleaning fires only when allowed and stops when ΔP falls.
- Isolate properly before working inside. Follow your lockout/tagout procedure for the fan, valve and compressed air.
Frequently Asked Questions
Should the rotary valve start before the fan?
Yes, in the usual dust collector sequence. IAC’s baghouse procedure starts the dust removal equipment, such as rotary airlocks and conveyors, before the main fan.
What is the shutdown sequence for a dust collector?
Stop the process, keep the dust removal conveyor and bag cleaning running for 10 to 20 minutes, stop the main fan, stop the cleaning system, then stop the dust removal equipment. This is IAC’s published order.
What does purging mean in a dust collector?
It usually means cleaning the filters with pulses of compressed air, and running the fan, cleaning and discharge on after the process stops so collected dust is cleared from the filters and hopper.
What is downtime cleaning?
Cleaning the filters after the fan has stopped. Donaldson’s Delta P Plus controller waits for the blower to come to a stop, then runs the cleaning mechanism for a preset time.
Why interlock the fan with the rotary valve?
If the valve stops, dust builds up in the hopper while the fan keeps pulling it in. Dropping the fan permit on a valve fault protects the hopper and filters.
How does the PLC know the rotary valve is actually turning?
A motor starter auxiliary contact only proves the contactor closed. A zero-speed or rotation sensor on the shaft proves the rotor is turning.
What happens if someone starts the fan during cleaning?
It depends on the controller. In Donaldson’s Vibra-Shake manual, starting up during the cleaning operation turns the shaker motor off.
Is a fan interlock a safety function?
It can be, especially with combustible dust. Have a qualified person assess the hazard and decide which interlocks need a rated safety design rather than standard PLC logic.
Sources and Further Reading
- IAC: Start Up and Shut Down Procedures for a Baghouse Dust Collector: start and stop order, purge run-on.
- Donaldson: Downflo Oval DFO 2-8 to 4-128 Installation and Operation Manual: rotary valve, Delta P Plus cleaning modes, alarms.
- Donaldson Torit: Vibra-Shake VS Installation and Operation Manual: fan run-down time and downtime cleaning.