Under the NEC, cable trays follow Article 392 and underground cable trenches follow Section 300.5. Trays must form a continuous, bonded, accessible system and respect fill limits. Buried cables and raceways must meet the minimum cover in Table 300.5, commonly 24 inches for direct-burial cable in general locations. Any trench must also meet OSHA excavation safety rules.

Before you start: This guide summarizes published explanations of the NEC. It does not reproduce the code, and section numbers can change between editions. Always confirm with your adopted NEC and the authority having jurisdiction, and locate underground utilities before digging.
TopicCable trayUnderground trench
Main NEC referenceArticle 392Section 300.5
AccessMust remain accessibleBuried, so harder to change
Main limitFill, support and bondingMinimum cover and backfill
ProtectionLocation and coversDepth, raceway and warning ribbon
Best forPlants with changing circuitsRoutes between buildings or equipment
A quick comparison.
Choosing tray or trenchUse cable tray for accessible indoor or structural routes, and underground raceway or direct-burial cable for outdoor routes, with greater cover under roads and parking areas.Tray or trench?Where does theroute run?Indoors or on structures, with changes likelyCable tray: open, accessible and easy to extendOutdoors between buildingsUnderground raceway or direct-burial cableUnder roads or parking areasBuried at the greater cover depth, in a suitable racewayIndustrialBasicsindustrialbasics.com
Figure 1: A starting point. Environment, code and future access decide the final route.

Cable Tray Requirements

The NEC treats a cable tray as a structural system for securely fastening or supporting cables and raceways. ABB’s Cable Tray Technical Guide (2020) summarizes these key rules:

Cable tray typesLadder tray has open rungs, ventilated tray has a perforated bottom and solid-bottom tray has a closed base.Three common cable tray bottomsLadderBest airflow, long spansVentilatedMore support for small cablesSolid bottomMost protection, least airflowIndustrialBasicsindustrialbasics.com
Figure 2: Plan views of each tray bottom.
RuleRequirementNEC section
Continuous systemMechanical breaks are allowed, but a bonding jumper must keep electrical continuity392.18(A)
Complete firstEach run must be complete before cables are installed392.18(B)
Walls and floorsPenetrations must limit the spread of smoke and fire392.18(D), 300.21
AccessibleMust not be permanently enclosed in the building structure392.18(E)
Working spaceLeave enough room for installation and maintenance392.18(F)
Over 600 V markingPermanent high-voltage warning at intervals of no more than 10 ft392.18(H)
Mixed voltagesOver 600 V needs a separator from lower voltage unless Type MC392.20(B)
Single conductors1/0 AWG or larger, marked for tray use, in qualifying industrial sites392.10(B)(1)
From ABB’s Cable Tray Technical Guide (2020). Section numbering can differ by NEC edition.
Reader tip: For single-conductor cables of 1/0 to 4/0 AWG in ladder tray, ABB notes a maximum rung spacing of 9 inches. They must also be installed in a single layer in ladder or ventilated tray.

Grounding and bonding

A metal tray must be electrically continuous and grounded. The Cable Tray Institute explains that NEC 392.60 allows it to serve as the equipment grounding conductor where qualified people maintain the system and all conditions in that section are met. Otherwise, run a separate equipment grounding conductor. See our ground wire size chart for sizing background.

Fill: worked examples for ladder or ventilated tray

ABB’s guide gives these minimum width formulas, where W is inside tray width in inches:

Cable typeRuleExampleResult
Multiconductor smaller than 4/0W ≥ 0.855 × total areaTotal area 10 in²W ≥ 8.55 in, use 9 in
Multiconductor 4/0 or largerW ≥ sum of diameters, single layerFive 2 in cablesW ≥ 10 in, use 12 in
Control or signalW ≥ 2 × total area ÷ usable height6 in², 4 in usable heightW ≥ 3 in, use 6 in
Illustrative values. Standard widths per ABB include 6, 9, 12, 18, 24, 30 and 36 in.

Solid-bottom tray and mixed cable loads use different limits, so read Section 392.22 directly. Fill is only one check. You also need ampacity, because cable grouping and airflow affect it. Our AWG ampacity chart and guide to electrical cables can help.

Underground Trench Requirements

Trench cover measurementCover is measured as the shortest distance from the top of the cable or raceway to finished grade.How burial cover is measuredFinished gradeWarning ribbon (service conductors)Cover: finished gradeto top of cable or racewayIndustrialBasicsindustrialbasics.com
Figure 3: Measure to the top of the cable or raceway, not to the trench floor.

Minimum cover depths

LocationDirect-burial cableRMC or IMCNonmetallic raceway listed for burial
General locations24 in6 in18 in
In trench below 2 in of concrete18 in6 in12 in
Under streets, roads, alleys, driveways and parking lots24 in24 in24 in
Solid rock, under at least 2 in of concreteRaceway only, 2 in2 in2 in
Selected rows from Table E3803.1 (Table 300.5), 2024 residential code on UpCodes. Check the NEC table for your edition. Higher-voltage circuits have separate requirements.

Other Section 300.5 rules

ItemRequirement
Emerging from gradeProtect up to at least 8 ft above grade. Below grade, protection need not extend more than 18 in
Service conductor ribbonAt least 12 in above the conductors
BackfillNo large rocks, concrete chunks, steel rods, mesh or sharp objects
MoistureSeal raceways at one or both ends where moisture could reach live parts
Raceway endsUse a bushing or fitting where a raceway ends underground
Ground movementAllow for settlement or frost, such as with S loops or expansion fittings
Same circuitKeep conductors together in a raceway, cable or close together in the trench
Inside underground racewaysTreated as a wet location
From EC&M’s explanations of Section 300.5, based on the 2017 and 2020 NEC.

Worked example: trench depth

A 1 in direct-burial cable runs through a general outdoor location that needs 24 in of cover. Because cover is measured to the top of the cable, the bottom of the cable sits at least 25 in below finished grade. Dig deeper if you need bedding, and measure from final grade, because later landscaping can reduce the cover.

Trench Safety

Cave-ins are the greatest risk to people working in trenches. OSHA’s fact sheet sets out these requirements:

Trench conditionOSHA requirement
5 ft or deeperProtective system required unless entirely in stable rock
Less than 5 ftA competent person may determine that no protective system is needed
20 ft or deeperSystem designed by a registered professional engineer, or based on approved tabulated data
Before entryCompetent person inspects daily and as conditions change
SpoilKeep soil and materials at least 2 ft from the edge
More than 4 ft deepTest for low oxygen, hazardous fumes and toxic gases
From OSHA’s Trenching and Excavation Safety fact sheet.
Danger: Never enter an unprotected trench. Locate buried utilities before digging, and treat any exposed cable as live until it is isolated under your lockout/tagout procedure.

Installation Checklist

  1. Confirm the code edition and any local amendments.
  2. Select the route and check the environment, including hazardous locations.
  3. Size conductors and protection, including the breaker rating.
  4. Check tray fill or burial cover for the chosen wiring method.
  5. Complete and bond the tray before pulling cable.
  6. Inspect the trench and backfill before closing it.
  7. Test insulation with a megger before energizing.
  8. Record the as-built route, especially for buried cable.

For the equipment at each end of the route, see our guide to what switchgear does.

Frequently Asked Questions

What is the difference between cable trays and trenches?

A cable tray is an exposed structural support system, usually indoors or on racks. A trench carries buried cables or raceways underground.

Which NEC article covers cable trays?

Article 392 covers cable trays. Article 300, including Section 300.5, covers underground installations.

How deep should a direct-buried cable be?

A common general value in Table 300.5 is 24 inches of cover, but it depends on wiring method and location. Check the table in your adopted code.

How is burial depth measured?

Cover is the shortest distance from the top of the cable or raceway to finished grade, concrete or similar cover.

Can power and control cables share a cable tray?

Multiconductor cables rated 600 V or less can share a tray. Cables over 600 V need a separator unless they are Type MC, according to ABB’s summary of NEC 392.20.

Can a metal cable tray be the equipment grounding conductor?

It can in qualifying installations under NEC 392.60, where qualified people maintain the system and the tray meets the section’s conditions.

Do underground cables need warning tape?

Underground service conductors need a warning ribbon at least 12 inches above them under 300.5(D)(3). It is often good practice on other circuits too.

When does a trench need a protective system?

OSHA requires one at 5 feet or deeper unless the excavation is entirely in stable rock. Below 5 feet, a competent person may decide it is not required.